Ciudad de Tartessos solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Ciudad de Tartessos solar farm (Planta solar fotovoltaica Ciudad de Tartessos I) is a solar photovoltaic (PV) farm in pre-construction in Trigueros, Huelva, Andalucía, Spain.

Project Details

Table 1: Phase-level project details for Ciudad de Tartessos solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner
1 Pre-construction[1] 2025 (planned)[2] 60.6 MWac[3] PV[4] Savanna Power 9 SLU [100%][1]
2 Pre-construction[5] 2025 (planned)[2] 60.6 MWac[6] PV[4] Savanna Power Solar 10 SLU [100%][5]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Ciudad de Tartessos solar farm

Phase Name Location Coordinates (WGS 84)
1 Trigueros, Huelva, Andalucía, Spain[7] 37.3499, -6.8339 (approximate)[7]
2 Trigueros, Huelva, Andalucía, Spain[7] 37.3499, -6.8339 (approximate)[7]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-17982 https://www.energiaestrategica.com/fervor-solar-en-espana-solo-los-proyectos-presentados-este-ano-duplicarian-a-toda-potencia-la-instalada/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-17982. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.0 2.1 https://www.power-technology.com/data-insights/power-plant-profile-ciudad-de-tartessos-i-solar-pv-park-spain/. {{cite web}}: Missing or empty |title= (help)
  3. "BOE-A-2023-17982 Resolución de 21 de julio de 2023, de la Dirección General de Política Energética y Minas, por la que se otorga a Savanna Power Solar 9, SLU, autorización administrativa previa para la planta solar fotovoltaica Ciudad de Tartessos I, de 60,569 MW". Boletín Oficial del Estado. 2023-08-05. Archived from the original on 2024-03-22. Retrieved 2024-03-21.
  4. 4.0 4.1 "Fervor solar en España: sólo los proyectos presentados este año duplicarían a toda potencia la instalada". Energía Estratégica España. 2022-05-31. Archived from the original on 2024-02-01.
  5. 5.0 5.1 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-17981 https://www.energiaestrategica.com/fervor-solar-en-espana-solo-los-proyectos-presentados-este-ano-duplicarian-a-toda-potencia-la-instalada/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-17981. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  6. "BOE-A-2023-17981 Resolución de 21 de julio de 2023, de la Dirección General de Política Energética y Minas, por la que se otorga a Savanna Power Solar 10, SLU, autorización administrativa previa para la planta solar fotovoltaica Ciudad de Tartessos II, de 60,569 MW, en Trigueros (Huelva)". Boletín Oficial del Estado. 2023-08-05. Archived from the original on 2024-04-13. Retrieved 2024-04-05.
  7. 7.0 7.1 7.2 7.3 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-17981 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-17982, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-17981. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)