Clair Phase 1 Oil and Gas Field (United Kingdom)
From Global Energy Monitor
This article is part of the Global Oil and Gas Extraction Tracker, a Global Energy Monitor project. |
Related categories: |
Clair Phase 1 Field is an operating oil and gas field in the United Kingdom.[1]
Location
The map below shows the exact location of the field in the United Kingdom.[1]
Project Details
- Status: Operating[1]
- Coordinates: 60.6757, -2.5593 (exact)[1]
- Operator: BP Exploration Operating Company[1]
- Owner: BP (45.1%); ConocoPhillips (7.5%); Ithaca Energy (19.4%); Shell UK Limited (28%)[2]
- Parent: BP P.L.C. (45.1%)[3]; ConocoPhillips (7.5%)[4]; Delek Group Limited (19.4%)[5]; Royal Dutch Shell (28%)[6]
- Discovery year: 1977[7]
- Production start year: 2005[7]
- Basin:
- Concession/Block:
- Project/Complex: Clair
Production and Reserves
Table 1: Production and Reserves - Clair Phase 1 Field
Category | Fuel Description | Reserve Classification | Quantity | Units | Data Year | Source |
---|---|---|---|---|---|---|
production | gas | Not applicable | 121 | million m³/y | 2019 | [1] |
production | oil | Not applicable | 12 | million bbl/y | 2019 | [1] |
- million bbl/y = million barrels per year
- million m³/y = million cubic meters per year
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "OGA Field Production Points, PPRS (WGS84)". Oil and Gas Authority. Archived from the original on September 17, 2021. Retrieved March 19, 2021.
- ↑ "BP to increase share in UK's giant Clair field and sell interest in Alaska's Kuparuk field - News - Home". United Kingdom. Archived from the original on August 31, 2021. Retrieved September 27, 2021.
- ↑ Legal Entity Identifier (LEI) 213800LH1BZH3DI6G760 Global Legal Entity Identifier Foundation, accessed January 2020
- ↑ "ConocoPhillips". ConocoPhillips. Archived from the original on August 31, 2021. Retrieved September 27, 2021.
- ↑ "About Us". Ithaca Energy. Archived from the original on August 31, 2021. Retrieved September 27, 2021.
- ↑ "Letter to the SEC". www.sec.gov. Archived from the original on August 31, 2021. Retrieved September 27, 2021.
- ↑ 7.0 7.1 "www.bp.com/en/global/corporate/investors/upstream-major-projects/major-projects-2018/clair-ridge.html". Archived from the original on August 31, 2021. Retrieved September 27, 2021.