Colbun FLNG Terminal

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error

Colbun FLNG Terminal, also known as Terminal de GNL Colbún and Terminal de GNL Colbún, is a cancelled (inferred 4 y) LNG import terminal in Chile.

Location

Table 1: Location details

Name Location Coordinates (WGS 84)
Colbun FLNG Terminal Bay of Quintero, Valparaíso, Chile[1][2] -32.783333, -71.533333 (approximate)

The map below shows the approximate location of the terminal:

Loading map...

Project Details

Table 2: Infrastructure details

mtpa = million tonnes per year
Name Facility type Status Capacity Total terminal capacity Offshore Associated infrastructure
Colbun FLNG Terminal import[1][3][4][2] cancelled (inferred 4 y)[4] 1.5 mtpa[1] 1.5 mtpa True –

Table 3: Cost

Name Facility type Cost Total known terminal costs
Colbun FLNG Terminal import[1][3][4][2] – –

Financing

No financing data available.

Table 4: Project timeline

FID = Final Investment Decision, used by some developers to indicate a project will move forward
Name Facility type Status Proposal year FID year Construction year Operating year Inactive year
Colbun FLNG Terminal import[1][3][4][2] cancelled (inferred 4 y)[4] – – – – 2018 (cancelled)[3][5]

Ownership

Table 5: Ownership

Name Facility type Status Owners Parent companies Operator
Colbun FLNG Terminal import[1][3][4][2] cancelled (inferred 4 y)[4] Colbún SA; AES Andes SA[2][2] AES Andes SA; Colbún SA –

Background

Colbún LNG Terminal was a proposed LNG terminal in Valparaíso, Chile.[6]

The terminal was a joint-venture project by Chilean energy companies Colbún and AES Gener. Colbún is owned by the Matte family, while AES Gener is a subsidiary of the US AES energy company.[7] The project had faced delays due to difficulty in finding a proper location for the terminal. Additionally, the expansion of the Quintero LNG Terminal has made the Colbún LNG Terminal project unnecessary, unless future conditions change. Both Colbún and AES Gener are already supplied with gas from the Quintero LNG Terminal.[8]

In 2014, AES Gener and Colbún cancelled their contract with Norwegian company Höegh, which was to install the floating LNG regasification plant, officially shelving the project.[9] There have been no development updates since then, and the project is presumed to be cancelled.

Articles and Resources

Additional data

To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://www.icis.com/explore/resources/news/2014/11/13/9838389/chile-s-enap-offloads-excess-2015-lng-cargoes-to-colbun/. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://www.argusmedia.com/pages/NewsBody.aspx?id=1336212&menu=yes. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 3.3 3.4 https://www.icis.com/resources/news/2013/04/25/9662659/chile-s-colbun-fsru-project-hits-delays-as-supply-talks-begin/. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 http://www.nuevamineria.com/revista/colbun-and-gener-canceled-deal-to-build-lng-tanker/. {{cite web}}: Missing or empty |title= (help)
  5. ↑ http://www.nuevamineria.com/revista/colbun-and-gener-canceled-deal-to-build-lng-tanker/; http://www.nuevamineria.com/revista/colbun-and-gener-canceled-deal-to-build-lng-tanker/ http://www.nuevamineria.com/revista/colbun-and-gener-canceled-deal-to-build-lng-tanker/; http://www.nuevamineria.com/revista/colbun-and-gener-canceled-deal-to-build-lng-tanker/; http://www.nuevamineria.com/revista/colbun-and-gener-canceled-deal-to-build-lng-tanker/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  6. ↑ Colbun LNG Terminal, News, accessed April 2017
  7. ↑ AES Gener to withdraw from Chile LNG expansion, Argus News, March 13, 2017
  8. ↑ Chile's Colbun FSRU project hits delays as supply talks begin, ICIS, accessed August 2017
  9. ↑ [1] Colbún and Gener canceled deal to build LNG tanker,] Revista Nueva Minería y Energía, August 6, 2014