Coldham Hall wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Coldham Hall wind farm is an operating wind farm in Fenland District, Cambridgeshire, East of England, England, United Kingdom.

Project Details

Table 1: Phase-level project details for Coldham Hall wind farm

Status Commissioning year Nameplate capacity Type Owner Operator
Operating[1] 2005[1] 14 MW[1] Onshore[1] ScottishPower Renewables [100%][2] the Co-Operative Group; ScottishPower Renewables[2][2]

Location

Table 2: Phase-level location details for Coldham Hall wind farm

Location Coordinates (WGS 84)
Fenland District, Cambridgeshire, East of England, England, United Kingdom[1] 52.603, 0.1149 (exact)[1]

The map below shows the exact location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20240327051815/https://www.gov.uk/government/publications/renewable-energy-planning-database-monthly-extract. Archived from the original on 27 March 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20210122180340/https://www.scottishpowerrenewables.com/pages/coldham.aspx. Archived from the original on 22 January 2021. {{cite web}}: Missing or empty |title= (help)