This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Coll de Targa wind farm is a shelved wind farm in el Vilosell, Garrigues, Cataluña, Spain.
Project Details
Table 1: Phase-level project details for Coll de Targa wind farm
Status | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|
Shelved (inferred February 2024) | 49.5 MW[1] | Onshore[1] | Forestalia SL [100%][2] | Energia Inagotable De Alfa[1] |
Location
Table 2: Phase-level location details for Coll de Targa wind farm
Location | Coordinates (WGS 84) |
---|---|
el Vilosell, Garrigues, Cataluña, Spain[1] | 41.3824, 0.9464 (approximate)[1] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 "Acord sobre la viabilitat de l'emplaçament de l'avantprojecte "Parc Eòlic Coll de Targa" als termes municipals de Vinaixa, el Vilosell i l'Albi (Garrigues)". Generalitat de Catalunya. 2021-02-22. Archived from the original on 2024-02-19.
- ↑ https://web.archive.org/web/20240131145904/https://www.somgarrigues.cat/noticies/5489/forestalia-torna-a-presentar-tres-projectes-eolics-i-solars-que-li-havien-denegat. Archived from the original on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help)