Coll de Targa wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Coll de Targa wind farm is a shelved wind farm in el Vilosell, Garrigues, Cataluña, Spain.

Project Details

Table 1: Phase-level project details for Coll de Targa wind farm

Status Nameplate capacity Type Owner Operator
Shelved[1] 49.5 MW[2] Onshore[2] Forestalia SL [100%][3] Energia Inagotable De Alfa[2]

Location

Table 2: Phase-level location details for Coll de Targa wind farm

Location Coordinates (WGS 84)
el Vilosell, Garrigues, Cataluña, Spain[2] 41.3824, 0.9464 (approximate)[2]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. ↑ https://www.segre.com/es/comarcas/segria/240504/mas-de-600-ha-de-placas-solares-y-36-molinos-se-han-quedado-sin-acceso-a-la-red-electrica_431340.html. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 "Acord sobre la viabilitat de l'emplaçament de l'avantprojecte "Parc Eòlic Coll de Targa" als termes municipals de Vinaixa, el Vilosell i l'Albi (Garrigues)". Generalitat de Catalunya. 2021-02-22. Archived from the original on 2024-02-19.
  3. ↑ https://web.archive.org/web/20240131145904/https://www.somgarrigues.cat/noticies/5489/forestalia-torna-a-presentar-tres-projectes-eolics-i-solars-que-li-havien-denegat. Archived from the original on 2024-01-31. {{cite web}}: Missing or empty |title= (help)