Contorno Bajo solar farm
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Contorno Bajo solar farm (Planta Solar Fotovoltaica Contorno Bajo) is a solar photovoltaic (PV) farm in pre-construction in Contorno Bajo, Viacha, Ingavi, La Paz, Bolivia.
Project Details
Table 1: Phase-level project details for Contorno Bajo solar farm
| Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
|---|---|---|---|---|---|---|
| 1 | Pre-construction[1] | 2026 (planned)[2] | 40 MW[3] | PV[4] | Empresa Eléctrica ENDE Guaracachi SA [100%][4] | Empresa Eléctrica ENDE Guaracachi[4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Contorno Bajo solar farm
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| 1 | Contorno Bajo, Viacha, Ingavi, La Paz, Bolivia[5] | -16.6454, -68.3620 (approximate)[5] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://www.egsa.bo/wp-content/uploads/2024/08/memoria-anual-2023-ende-guaracachi-sa.pdf, https://www.pv-magazine-latam.com/2023/01/19/bolivia-construira-una-planta-de-40-mw-con-baterias-a-3-905-metros-sobre-el-nivel-del-mar-2/ https://www.abi.bo/index.php/reportajes/36-notas/noticias/economia/60342-comision-de-planificacion-aprueba-dos-nuevos-proyectos-de-financiamiento-para-generar-empleo-y-energia-solar, https://www.egsa.bo/wp-content/uploads/2024/08/memoria-anual-2023-ende-guaracachi-sa.pdf, https://www.pv-magazine-latam.com/2023/01/19/bolivia-construira-una-planta-de-40-mw-con-baterias-a-3-905-metros-sobre-el-nivel-del-mar-2/.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ (PDF) https://sawi.aetn.gob.bo/docfly/app/webroot/uploads/AETN24-1213155937(nramirez)2.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://www.pv-magazine-latam.com/2023/01/19/bolivia-construira-una-planta-de-40-mw-con-baterias-a-3-905-metros-sobre-el-nivel-del-mar-2/, https://www.egsa.bo/wp-content/uploads/2024/08/memoria-anual-2023-ende-guaracachi-sa.pdf https://www.abi.bo/index.php/reportajes/36-notas/noticias/economia/60342-comision-de-planificacion-aprueba-dos-nuevos-proyectos-de-financiamiento-para-generar-empleo-y-energia-solar, https://www.pv-magazine-latam.com/2023/01/19/bolivia-construira-una-planta-de-40-mw-con-baterias-a-3-905-metros-sobre-el-nivel-del-mar-2/, https://www.egsa.bo/wp-content/uploads/2024/08/memoria-anual-2023-ende-guaracachi-sa.pdf.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 "Memoria Anual 2023" (PDF). ENDE Guaracachi. Archived from the original (PDF) on 2024-08-27.
- ↑ 5.0 5.1 https://www.egsa.bo/proyecto/solares-fotovoltaicos-318-mw/ https://www.abi.bo/index.php/reportajes/36-notas/noticias/economia/60342-comision-de-planificacion-aprueba-dos-nuevos-proyectos-de-financiamiento-para-generar-empleo-y-energia-solar, https://www.egsa.bo/proyecto/solares-fotovoltaicos-318-mw/.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help)
