Corallita Gas Field (Trinidad and Tobago)

From Global Energy Monitor

[español]

This article is part of the Global Oil and Gas Extraction Tracker, a Global Energy Monitor project.
Related categories:

Corallita Field is an operating gas field in Trinidad and Tobago.[1]

Location

The map below shows the exact location of the field in Trinidad and Tobago.[2]

Loading map...

Project Details

  • Status: Operating[1]
  • Operator: BPTT[3]
  • Owner: BPTT (100%)[3]
  • Parent: BP P.L.C. (100%)[4]
  • Discovery year: 1996[3]
  • Production start year: 2017[1]
  • Basin: Columbus
  • Concession/Block: Not stated
  • Project/Complex: Not stated

Production and Reserves

Table 1: Production and Reserves - Corallita Field

Category Fuel Description Reserve Classification Quantity Units Data Year
reserves gas reserves 31 148[5] million m³ 2017
million m³ = million cubic meters

Articles and Resources

References

  1. 1.0 1.1 1.2 "BPTT: Juniper starts gas production offshore Trinidad and Tobago". Oil & Gas Journal. August 14, 2017. Archived from the original on May 27, 2021. Retrieved May 28, 2021.
  2. "Energy Map of Trinidad and Tobago" (PDF). Petroleum Economist. January 1, 2017. Archived (PDF) from the original on August 7, 2020. Retrieved May 28, 2021.
  3. 3.0 3.1 3.2 "Juniper Offshore Gas Project". Offshore Technology. Archived from the original on May 27, 2021. Retrieved May 28, 2021.
  4. "BP in Trinidad and Tobago". BP TT. Archived from the original on June 13, 2021. Retrieved June 14, 2021.
  5. "BPTT's Juniper project begins production". The Energy Year. August 14, 2017. Archived from the original on May 27, 2021. Retrieved May 28, 2021.