Corpus Christi hydroelectric plant
From Global Energy Monitor
| Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Other names: Itacurubi
Corpus Christi hydroelectric plant (Proyecto Hidroeléctrico Corpus Christi) is an announced hydroelectric power plant on the border of Misiones, Argentina and , Paraguay.
Project Details
Table 1: Project details for Corpus Christi hydroelectric plant
| Status | Commissioning year | Nameplate capacity | Turbines | Technology type |
|---|---|---|---|---|
| Announced[1] | 2034 (planned)[2] | 2880 MW[3] | 20 x 144 MW[3] | Conventional storage[3] |
Location
Table 2: Location details for Corpus Christi hydroelectric plant
| Cross-border location 1 | Cross-border location 2 | River | Coordinates (WGS 84) |
|---|---|---|---|
| Misiones, Argentina[1][3] | Itapúa, Paraguay[1][3] | Río Paraná[3] | -27.1196, -55.5653 (approximate)[1][3] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 (PDF) https://web.archive.org/web/20220625024429/https://comip.org.ar/wp-content/uploads/2020/11/Sintesis-Ejecutiva-en-ingles_compressed-1.pdf. Archived from the original (PDF) on 2022-06-25.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://www.ande.gov.py/documentos/plan_maestro/PLAN%20MAESTRO%20DE%20GENERACION%202024-2043.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 https://web.archive.org/web/20220625000308/https://ejatlas.org/print/proyecto-hidroelectrico-corpus-christi. Archived from the original on 2022-06-25.
{{cite web}}: Missing or empty|title=(help)
