Project Details

  • Status: Operating[1]
  • Coordinates: 54.3290, -11.0630 (exact)[2]
  • Operator: Vermilion Exploration and Production Ireland Limited (VEPIL)[3]
  • Owner: Canada Pension Plan Investment Board (43.5%); Vermilion Energy (20%); Equinor Energy Ireland Limited (36.5%)[4]
  • Parent: Canada Pension Plan Investment Board (43.5%)[5]; Vermilion Energy Inc. (20%)[6]; Equinor ASA (36.5%)[7]
  • Discovery year: 1996[8]
  • Production start year: 2015[1]
  • Basin:
  • Concession/Block:
  • Project/Complex:

Production and Reserves

Table 1: Production and Reserves - Corrib Field

Category Fuel Description Reserve Classification Quantity Units Data Year Source
production gas Not applicable 599 million m³/y 2017 [9]
reserves hydrocarbons 2P reserves 120 million boe 2018 [10]
million boe = barrels of oil equivalent
million m³/y = million cubic meters per year

Articles and Resources

References

  1. 1.0 1.1 1.2 "assets.gov.ie/87691/b64b5fd4-c2ad-4bc1-833c-789e33fbc44e.pdf" (PDF). Archived from the original (PDF) on August 31, 2021. Retrieved September 27, 2021.
  2. 2.0 2.1 "Search Via GIS Map". gis.dcenr.gov.ie. Archived from the original on August 31, 2021. Retrieved September 27, 2021.
  3. "Public consultation on application for consent to conduct an offshore pipeline and subsea structure inspection to include repair and maintenance work as necessary and a near shore pipeline inspection at Corrib Offshore Pipeline and Umbilical system from the landfall valve site in Glengad, Co. Mayo to the Corrib Wells by Vermilion Exploration and Production Ireland Limited who currently hold the Corrib Petroleum Lease". www.gov.ie. Archived from the original on August 31, 2021. Retrieved September 27, 2021.
  4. "www.dccae.ie/documents/Acreage%20Position%20Report%20at%2030%20September%202020.pdf" (PDF). Archived from the original (PDF) on August 31, 2021. Retrieved September 27, 2021.
  5. "About Us". CPP Investments. Archived from the original on August 31, 2021. Retrieved September 27, 2021.
  6. "Overview - Vermilion Energy". www.vermilionenergy.com. Archived from the original on August 31, 2021. Retrieved September 27, 2021.
  7. "www.equinor.com/content/dam/statoil/documents/annual-reports/2020/equinor-2020-annual-report-and-form-20-f.pdf" (PDF). Archived from the original (PDF) on August 31, 2021. Retrieved September 27, 2021.
  8. "www.dccae.ie/en-ie/natural-resources/topics/Oil-Gas-Exploration-Production/exploration-and-production/Pages/Exploration-and-Production.aspx". Archived from the original on August 31, 2021. Retrieved September 27, 2021.
  9. "Production Information - Vermilion Energy Ireland". www.vermilionenergy.ie. Archived from the original on August 31, 2021. Retrieved September 27, 2021.
  10. Inc, Vermilion Energy. "Vermilion Energy Inc. Announces the Assumption of Operatorship of the Corrib Project". www.prnewswire.com. Archived from the original on August 31, 2021. Retrieved September 27, 2021.