Creyke Beck Substation solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Creyke Beck Substation solar farm is a solar photovoltaic (PV) farm in pre-construction in East Riding of Yorkshire, Yorkshire and Humber, England, United Kingdom.

Project Details

Table 1: Phase-level project details for Creyke Beck Substation solar farm

Status Nameplate capacity Technology
Pre-construction[1] 50 MW[2] PV[3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Creyke Beck Substation solar farm

Location Coordinates (WGS 84)
East Riding of Yorkshire, Yorkshire and Humber, England, United Kingdom[4] 53.7806, -0.4187 (exact)[5]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. UKGov2022
  2. UKGov2022
  3. UKGov2022
  4. UKGov2022
  5. UKGov2022