Crump Geyser geothermal plant
From Global Energy Monitor
| This article is part of the Global Geothermal Power Tracker, a Global Energy Monitor project. |
Crump Geyser geothermal plant is a cancelled geothermal power plant in Adel, Oregon, United States.
Project Details
Table 1: Unit-level project details for Crump Geyser geothermal plant
| Status | Nameplate capacity | Technology | Owner |
|---|---|---|---|
| Cancelled[1][2] | 30 MW[1] | Unknown type | Nevada Geothermal Power Co [50%]; Ormat Technology Inc [50%][1][1] |
Location
Table 2: Unit-level location details for Crump Geyser geothermal plant
| Location | Coordinates (WGS 84) |
|---|---|
| Adel, Oregon, United States[3] | 42.1774, -119.8986 (approximate)[3] |
The map below shows the approximate location of the geothermal power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://web.archive.org/web/20220512145253/https://www.thinkgeoenergy.com/ormat-nevada-geothermal-power-start-drilling-at-crump-geyser/. Archived from the original on 2022-05-12.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.osti.gov/biblio/1184025.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 https://web.archive.org/web/20220512152158/https://www.heraldandnews.com/news/article_50fac242-09b0-11e0-87af-001cc4c03286.html. Archived from the original on 2022-05-12.
{{cite web}}: Missing or empty|title=(help)
