Curiscao wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Curiscao wind farm is an operating wind farm in Salas, Asturias, Asturias, Spain.


Project Details

Table 1: Phase-level project details for Curiscao wind farm

Phase name Status Commissioning year Nameplate capacity Mount type Owner Operator
1 Operating[1] 2007[2] 43[1] Onshore EDP Renovables España[3] Eólica Curiscao Pumar Sa[1]


Location

Table 2: Phase-level location details for Curiscao wind farm

Phase name Location Coordinates (WGS 84)
1 Salas, Asturias, Asturias, Spain[4] 43.4712, -6.3090 (exact)[5]

The map below shows the exact location of the wind farm:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 "www.aeeolica.org/sobre-la-eolica/la-eolica-espana/mapa-de-parques-eolicos/asturias/curiscao-fase-i-2018-05-06-09-21-19". Archived from the original on September 9, 2021. Retrieved November 29, 2021.
  2. "sede.asturias.es/Asturias/descargas/PDF_TEMAS/Industria%20y%20Energia/Industria%20y%20Energia%20en%20Asturias/Parques%20Eolicos/ppee_funcionando_listado.pdf" (PDF). Archived from the original (PDF) on October 23, 2021. Retrieved November 29, 2021.
  3. "www.edp.com/sites/default/files/2020-04/1Q20%20Operating%20Data.xlsx". Archived from the original on September 10, 2021. Retrieved November 10, 2021.
  4. https://www.thewindpower.net/windfarm_en_226.php. Archived from the original on June 26, 2022. {{cite web}}: Missing or empty |title= (help)
  5. "Curiscao Fase I (Spain)". The Wind Power. Archived from the original on September 9, 2021. Retrieved November 29, 2021.