30em

📝 Help us learn how people like you use GEM Wiki! Take this short survey!📝

Data will be retained following our Privacy Policy. The survey is completed in Google Forms (Privacy policy and Terms of Service)

Currimao (Northern Sun) Solar Power Project

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Currimao (Northern Sun) Solar Power Project is a solar farm in pre-construction in Paoay, Ilocos Norte, Philippines.

Project Details

Table 1: Phase-level project details for Currimao (Northern Sun) Solar Power Project

Status Nameplate capacity Technology Owner
Pre-construction[1] 244.8 MWac[1] Assumed PV Northern Sun Power Inc[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Currimao (Northern Sun) Solar Power Project

Location Coordinates (WGS 84)
Paoay, Ilocos Norte, Philippines[1] 18.0762, 120.5171 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 (PDF). 2024-04 https://web.archive.org/web/20240627164550/https://doe.gov.ph/sites/default/files/pdf/electric_power/SIS-to-NGCP-Summary-April-2024.pdf. Archived from the original (PDF) on 2024-06-27. Retrieved 2024-06-20. {{cite web}}: Check date values in: |date= (help); Missing or empty |title= (help)