Cutlass Solar
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Cutlass Solar is an operating solar photovoltaic (PV) farm in Fort Bend County, Texas, United States.
Project Details
Table 1: Phase-level project details for Cutlass Solar
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2022[1] | 111 MWac[1] | PV[1] | Advanced Power AG; ENEOS Corp; Fuyo General Lease Co Ltd[2] | SOLV Energy[3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Cutlass Solar
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Fort Bend County, Texas, United States[1] | 29.4097, -95.7341 (exact)[1] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}
: Check date values in:|access-date=
(help) - ↑ https://www.advancedpower.ch/home/projects/, https://www.advancedpower.ch/home/projects/ https://www.advancedpower.ch/home/projects/, https://www.advancedpower.ch/home/projects/, https://www.advancedpower.ch/home/projects/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240206175702/https://www.nsenergybusiness.com/news/advanced-power-140mw-cutlass-solar/. Archived from the original on 2024-02-06.
{{cite web}}
: Missing or empty|title=
(help)