Dabar hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Other names: Dabrava
Dabar hydroelectric plant is a hydroelectric power plant under construction in Berkovići, Republika Srpska, Bosnia and Herzegovina.
Project Details
Table 1: Project details for Dabar hydroelectric plant
Status | Commissioning year | Nameplate capacity | Turbines | Technology type | Owner |
---|---|---|---|---|---|
Construction[1] | 2027 (planned)[1] | 159 MW[2] | 3[2] | Conventional storage[3] | unknown [14%]; Pension Reserve Fund of the Republic of Srpska [10%]; Republic of Srpska Restitution Fund [5%]; Elektroprivreda Republike Srpske (ERS) [65%]; Kristal Invest [5%][4][4][4][4][4] |
Location
Table 2: Location details for Dabar hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Berkovići, Berkovići, Republika Srpska, Bosnia and Herzegovina[5][6] | Trebišnjica River[1] | 43.0909, 18.2004 (approximate)[5][6] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://web.archive.org/web/20230824211751/https://balkangreenenergynews.com/works-launched-on-160-mw-hydropower-plant-dabar-in-bileca/. Archived from the original on 2023-08-24.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20220816035533/https://ers.ba/project-details/he-dabar-project/. Archived from the original on 2022-08-16.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20210227145913/https://henatrebisnjici.com/project/he-dabar-project/.
{{cite web}}
: Check|archive-url=
value (help); Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 https://web.archive.org/web/20220816042703/https://balkangreenenergynews.com/ers-eyes-loan-capital-increase-to-secure-funds-for-hpp-dabar-hpps-on-bistrica-river/. Archived from the original on 2022-08-16.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 (PDF) https://web.archive.org/web/20220816190526/http://www.israel-srpska.com/ckfinder/userfiles/files/Hydropower%20system%20Upper%20Horizons.pdf. Archived from the original (PDF) on 2022-08-16.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 (PDF) https://web.archive.org/web/20220816190255/https://www.fig.net/resources/proceedings/2014/2014_ingeo/TS2-02_Trifkovic.pdf.pdf. Archived from the original (PDF) on 2022-08-16.
{{cite web}}
: Missing or empty|title=
(help)