Dalate power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Dalate power station (华能北方联合电力达拉特发电厂) is an operating power station of at least 4180-megawatts (MW) in Shulinzhao Town, Dalad, Ordos, Inner Mongolia, China with multiple units, some of which are not currently operating. It is also known as 京达发电公司 (Phase III Unit 5 & 6), 蒙达发电公司 (Phase I Unit 1 & 2, Phase II Unit 3 & 4), 聚达发电公司 (Phase IV Unit 7 & 8), 内蒙古达拉特发电厂五期扩建工程.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Dalate power station | Shulinzhao Town, Dalad, Ordos, Inner Mongolia, China | 40.36695, 109.99604 (exact) |
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6, Phase IV Unit 7, Phase IV Unit 8, Phase V Unit 10, Phase V Unit 9: 40.36695, 109.99604
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| Phase I Unit 1 | Operating | coal: bituminous[1] | 330 | subcritical | yes | 1995 | False |
| Phase I Unit 2 | Operating | coal: bituminous[1] | 330 | subcritical | yes | 1996 | False |
| Phase II Unit 3 | Operating | coal: bituminous[1] | 330 | subcritical | yes | 1998 | False |
| Phase II Unit 4 | Operating | coal: bituminous[1] | 330 | subcritical | yes | 1998 | False |
| Phase III Unit 5 | Operating | coal: bituminous[1] | 330 | subcritical | yes | 2004 | False |
| Phase III Unit 6 | Operating | coal: bituminous[1] | 330 | subcritical | yes | 2004 | False |
| Phase IV Unit 7 | Operating | coal: bituminous[1] | 600 | supercritical | yes | 2006 | False |
| Phase IV Unit 8 | Operating | coal: bituminous[1] | 600 | supercritical | yes | 2007 | False |
| Phase V Unit 10 | Announced[2] | coal: bituminous[1][2] | 1000[2] | ultra-supercritical[2] | – | – | False |
| Phase V Unit 9 | Operating[3] | coal: bituminous[4][1] | 1000[4] | ultra-supercritical[4] | – | 2024[3] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase I Unit 1 | Inner Mongolia Mengda Power Generation Co Ltd [100%] | Inner Mongolia MengDian HuaNeng Thermal Power Corp Ltd [53.0%]; Beijing Jingneng Power Co Ltd [47.0%] |
| Phase I Unit 2 | Inner Mongolia Mengda Power Generation Co Ltd [100%] | Inner Mongolia MengDian HuaNeng Thermal Power Corp Ltd [53.0%]; Beijing Jingneng Power Co Ltd [47.0%] |
| Phase II Unit 3 | Inner Mongolia Mengda Power Generation Co Ltd [100%] | Inner Mongolia MengDian HuaNeng Thermal Power Corp Ltd [53.0%]; Beijing Jingneng Power Co Ltd [47.0%] |
| Phase II Unit 4 | Inner Mongolia Mengda Power Generation Co Ltd [100%] | Inner Mongolia MengDian HuaNeng Thermal Power Corp Ltd [53.0%]; Beijing Jingneng Power Co Ltd [47.0%] |
| Phase III Unit 5 | Inner Mongolia Jingda Power Generation Co Ltd [100%] | Inner Mongolia MengDian HuaNeng Thermal Power Corp Ltd [40.0%]; Beijing Jingneng Power Co Ltd [30.0%]; China Shenhua Energy Co Ltd [30.0%] |
| Phase III Unit 6 | Inner Mongolia Jingda Power Generation Co Ltd [100%] | Inner Mongolia MengDian HuaNeng Thermal Power Corp Ltd [40.0%]; Beijing Jingneng Power Co Ltd [30.0%]; China Shenhua Energy Co Ltd [30.0%] |
| Phase IV Unit 7 | Inner Mongolia Juda Power Generation Co Ltd [100%] | Inner Mongolia MengDian HuaNeng Thermal Power Corp Ltd [100.0%] |
| Phase IV Unit 8 | Inner Mongolia Juda Power Generation Co Ltd [100%] | Inner Mongolia MengDian HuaNeng Thermal Power Corp Ltd [100.0%] |
| Phase V Unit 10 | Dalat Banner Power Generation Branch of North United Power Co Ltd [100%] | China Huaneng Group Co Ltd [74.8%]; Guangdong Hengjian Investment Holding Co Ltd [15.2%]; China Shenhua Energy Co Ltd [10.0%] |
| Phase V Unit 9 | Dalat Banner Power Generation Branch of North United Power Co Ltd [100%][4] | China Huaneng Group Co Ltd [74.8%]; Guangdong Hengjian Investment Holding Co Ltd [15.2%]; China Shenhua Energy Co Ltd [10.0%] |
Project-level coal details
- Coal source(s): domestic
Background
Dalate power station is a 3,180 MW coal-fired power station in Inner Mongolia Autonomous Region, owned by China Huaneng. The plant's existing eight units were completed between 1995 and 2007:[5]
- Units 1-4 (330 MW each, subcritical) - operating 1995
- Units 5-6 (330 MW each, subcritical) - operating 2004
- Units 7-8 (600 MW each, supercritical) - operating 2007
Proposed expansion
China Huaneng has proposed adding a Units 9 & 10 at the power station, totaling 2,000 MW (1,000 MW each).[6][7][8]
Plans for the expansion appeared cancelled in the wake of China's traffic light policy. The policy, first issued in 2016, limited coal plant development in certain regions, including Inner Mongolia. (For more information, see China's Restrictions on Development of Coal-Fired Power Capacity.)
However, the traffic light policy was loosened in February 2020 and Inner Mongolia was issued a green light for coal plant development. In March 2020, plans for the project were revived.[9] In April 2020, Unit 9 completed a pre-feasibility report.[10] In May 2020, unit 9 was permitted for construction. It is planned for operation in 2022.[11]
Construction on Unit 9 reportedly began in May 2022[12] and progress steadily.[13][14] Unit 9 achieved its first boiler ignition in May 2024[15][16], followed by successful turbine speed control in June 2024[17][18], grid connection in June 2024[19]. The completion of the 168-hour trial run happened in July 2024[20].
In June and July 2026, a series of tenders were issued for the feasibility study[21][22], environmental impact assessment[23], and access system report[24][25] for the replacement expansion project Unit 10.
In 2023, major equipment and construction progressed. Unit 9 achieved boiler ignition in May 2024, turbine spin in June 2024, grid connection in June 2024, and completed its 168-hour trial run in July 2024[26].
In February 2026, feasibility study bidding began. In March 2026, the feasibility study contract was awarded. In April 2026, access system report bidding began. In June 2026, EIA report bidding was awarded, and access system report bidding was announced. In July 2026, feasibility study review bidding was announced[27].
Plant Details for Existing Units 1-8
- Sponsor: North United Power Co Ltd
- Parent company: China Huaneng
- Location: Shulinzhao Town, Dalate (Dalad) Banner, Ordos (E'erduosi) Prefecture, Inner Mongolia Autonomous Region, China
- Coordinates: 40.36695, 109.99604 (exact)
- Status: Operating
- Gross capacity: 3,180 MW (Units 1-6: 330 MW; Units 7 & 8: 600 MW)
- Type: Subcritical (Units 1-6), Supercritical (Units 7-8)
- In service: 1995-98 (Units 1-4); 2004 (Units 5 & 6); 2006-07 (Units 7 & 8)
- Coal type:
- Coal source:
- Source of financing:
Articles and Resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 https://news.bjx.com.cn/html/20260212/1484038.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 https://news.bjx.com.cn/html/20240722/1390134.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 https://news.bjx.com.cn/html/20200529/1076920.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 北方联合电力达拉特发电厂, China Huaneng website, Oct. 17, 2010.
- ↑ "北方联合电力有限责任公司达拉特发电厂五期2×1000MW机组扩建工程可行性研究,", 初步设计及施工图设计项目招标公告, 2012-04-26
- ↑ "达拉特发电厂五期2×1000MW机组扩建工程的环境影响评价报告书编制招标," hbhjcw.com, accessed July 2015
- ↑ "鄂尔多斯市人民政府关于2013年工业经济工作指导意见," 2014-02-08
- ↑ "投资61亿元!达拉特发电厂 2×100万千瓦扩建项目签约," 北极星电力网新闻中心, 2020/3/14
- ↑ "达拉特发电厂煤电一体化五期1×1000MW级机组扩建工程项目环评一次公示," 北极星电力网新闻中心, 2020/4/3
- ↑ "100万千瓦!华能达拉特发电厂五期扩建项目获得核准," 北极星电力网新闻中心, 2020/5/29
- ↑ 达拉特电厂9号1000兆瓦机组主体工程开工, BJX, 2022-05-07
- ↑ "华能达拉特发电厂五期1×1000MW机组扩建工程国产碟阀采购中标结果公示". 北极星电力网. 2023-06-28. Retrieved 2023-8-21.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "1×1000MW!达拉特五期扩建工程除氧器顺利吊装完成". 能源电力新观察. 2023-07-21. Retrieved 2023-8-21.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "华能北方公司、蒙西电网首台单机容量100万千瓦火电机组——达拉特发电厂五期工程9号机组锅炉首次点火一次成功". BJX. 2024-05-07. Retrieved 2026-07-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "达拉特发电厂五期工程9号机组锅炉首次点火一次成功". WeChat. 2024-05-05. Retrieved 2026-07-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华能北方公司达拉特发电厂五期1×100万千瓦机组扩建工程9号机组汽轮机冲车定速一次成功". WeChat. 2024-06-02. Retrieved 2026-07-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华能北方公司达拉特发电厂五期1×100万千瓦机组扩建工程9号机组汽轮机冲车定速一次成功". BJX. 2024-06-04. Retrieved 2026-07-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "达拉特发电厂五期1×1000MW机组扩建工程9号机组首次并网一次成功". BJX. 2024-06-13. Retrieved 2026-07-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华能北方公司首台100万千瓦机组达拉特发电厂五期1×100万千瓦机组扩建工程9号机组顺利通过168小时试运行". WeChat. 2024-07-20. Retrieved 2026-07-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "达拉特发电厂等容量替代扩建1×100万千瓦煤电机组可行性研究报告编制招标". BJX. 2026-02-12. Retrieved 2026-07-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华能北方公司达拉特发电厂等容量替代扩建1台100万千瓦煤电机组可行性研究报告编制服务采购中标候选人公示". BJX. 2026-03-19. Retrieved 2026-07-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华能北方公司达拉特发电厂等容量替代扩建1台100万千瓦煤电机组项目环境影响评价报告编制服务项目招标中标候选人公示". BJX. 2026-06-15. Retrieved 2026-07-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华能北方公司达拉特发电厂等容量替代扩建1台100万千瓦煤电机组项目接入系统报告编制服务招标". WeChat. 2026-04-29. Retrieved 2026-07-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华能北方公司达拉特发电厂等容量替代扩建1台100万千瓦煤电机组项目接入系统报告编制服务招标公告". WeChat. 2026-06-30. Retrieved 2026-07-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华能北方公司首台100万千瓦机组达拉特发电厂五期1×100万千瓦机组扩建工程9号机组顺利通过168小时试运行". 微信公众平台. 2024-07-20. Retrieved 2024-07-26.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华能北方公司达拉特发电厂等容量替代扩建1台100万千瓦煤电机组项目可研评审服务招标公告". 微信公众平台. 2026-07-15. Retrieved 2026-07-17.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.