Dalia-Camelia Oil Project (Angola)
From Global Energy Monitor
This article is part of the Global Oil and Gas Extraction Tracker, a Global Energy Monitor project. |
Related categories: |
Dalia-Camelia Project is an operating oil project in Angola.[1]
Location
The map below shows the exact location of the project in Angola.[2]
Project Details
- Status: Operating[1]
- Coordinates: -7.6818, 11.7542 (exact)[2]
- Operator: TotalEnergies[3]
- Owner: TotalEnergies (40%); Statoil (23.3%); Esso Exploration Angola (block 17) Ltd (20%); BP Exploration Angola Ltd (16.7%)[4]
- Parent: TotalEnergies (40%)[5][6]; Equinor ASA (23.3%)[7]; ExxonMobil Corporation (20%)[8]; BP P.L.C. (16.7%)[9]
- Discovery year: 1997[10]
- Production start year: 2006[3]
- Basin:
- Concession/Block: Block 17[1]
- Project/Complex: Dalia-Camelia
Production and Reserves
Table 1: Production and Reserves - Dalia-Camelia Project
Category | Fuel Description | Reserve Classification | Quantity | Units | Data Year | Source |
---|---|---|---|---|---|---|
production | oil | Not applicable | 47 | million bbl/y | 2019 | [11] |
reserves | oil | 2P reserves | 1 000 | million bbl | 2006 | [10] |
- million bbl = million barrels
- million bbl/y = million barrels per year
Articles and Resources
References
- ↑ 1.0 1.1 1.2 "Angola: Total Starts Production From Zinia Phase 2, Successful Short-cycle Development on Block 17". www.businesswire.com. May 6, 2021. Archived from the original on August 31, 2021. Retrieved September 27, 2021.
- ↑ 2.0 2.1 "www.offshore-mag.com/production/article/16782158/total-starts-clov-oil-production-offshore-angola". Archived from the original on August 31, 2021. Retrieved September 27, 2021.
- ↑ 3.0 3.1 "www.woodmac.com/reports/upstream-oil-and-gas-block-17-daliacamelia-1807419". Archived from the original on August 31, 2021. Retrieved September 27, 2021.
- ↑ "www.ogj.com/drilling-production/production-operations/field-start-ups/article/17246433/total-starts-oil-flow-from-dalia-phase-1a-on-block-17-off-angola". Archived from the original on August 31, 2021. Retrieved September 27, 2021.
- ↑ Legal Entity Identifier (LEI) 529900S21EQ1BO4ESM68 Global Legal Entity Identifier Foundation, accessed January 2020
- ↑ "Our Company". TotalEnergies.com. Archived from the original on August 31, 2021. Retrieved September 27, 2021.
- ↑ "About our name change - Equinor - equinor.com". www.equinor.com. Archived from the original on August 31, 2021. Retrieved September 27, 2021.
- ↑ "Subsidiaries of the Registrant". www.sec.gov. Archived from the original on August 31, 2021. Retrieved September 27, 2021.
- ↑ Legal Entity Identifier (LEI) 549300CC4BI5U2VDJV83 Global Legal Entity Identifier Foundation, accessed January 2020
- ↑ 10.0 10.1 "Dalia Field - Offshore Technology - Oil and Gas News and Market Analysis". www.offshore-technology.com. Archived from the original on August 31, 2021. Retrieved September 27, 2021.
- ↑ "Rystad Energy - West Africa: lack of new projects driving decline wave". www.rystadenergy.com. Archived from the original on August 31, 2021. Retrieved September 27, 2021.