Damaiyu LNG Terminal (玉环大麦屿LNG中转储运接收站) is a proposed LNG terminal in Taizhou, Zhejiang, China.

Location

Loading map...

Project details

  • Operator: Yuhuan Damaiyu Jun'an LNG Co., Ltd. 玉环大麦屿君安液化天然气有限公司[1]
  • Owner:
  • Parent company:
  • Location: Yuhuan, Taizhou, Zhejiang, China
  • Coordinates: 28.106107, 121.134782 (exact)
  • Capacity: 1–2 mtpa[2][3]
  • Status: Proposed
  • Type: Import
  • Start year: 2022[4]

Background

A EPC contract between the Huanqiu Company and Zhejiang Junan Energy to build the terminal was signed in June 2018.[5]

Taizhou Yuhuan city Government and Shenergy Group signed a cooperation agreement on the Zhejiang Yuhuan Damaiyu LNG terminal project on September 30, 2020. The construction date was set at the end of 2020, and is expected to operation in 2022. [2][4]

The total investment will be 5.4 billion yuan ($827 million), including the LNG terminal and the supporting pipelines. The receiving capacity is 2 mtpa for the first phase.[2]

As of January 2022, construction had not yet begun.[6][7]

Articles and resources

References

  1. 玉环大麦屿君安液化天然气有限公司 QCC.com
  2. 2.0 2.1 2.2 浙江台州玉环大麦屿LNG储运中转站项目成功签约 Source:浙江日报 作者:杨群, 10-22-2020
  3. "台州港迈入高质量发展"快车道"". tyjrswj.zjtz.gov.cn. Retrieved 2022-06-23.
  4. 4.0 4.1 君安天然气投资的玉环大麦屿LNG接收站和储运中转站项目介绍 Source: 来源:国际船舶海工网, 12-16-2020
  5. 浙江省玉环县大麦屿能源(LNG)中转储运项目储运站工程总承包合同签约仪式在寰球公司总部举行。寰球公司总经理王新革、浙江君安能源董事长梁炜立等出席签约仪式。, Kuaibao, Jun. 16, 2018
  6. "省纪委省监委公布两批漠视侵害群众利益问题专项治理工作成果". www.thehour.cn. Retrieved 2022-06-23.
  7. "浙江玉环:专班攻坚促省重点项目早建成-新华网". www.zj.xinhuanet.com. Retrieved 2022-06-23.

Related GEM.wiki articles

External resources

External articles