Dandong Jinshan power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Dandong Jinshan power station (华电丹东金山热电厂) is an operating power station of at least 600-megawatts (MW) in Tongxing Town, Zhen'an, Dandong, Liaoning, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Dandong Jinshan power station | Tongxing Town, Zhen'an, Dandong, Liaoning, China | 40.10626, 124.31927 (exact)[1] |
Unit-level coordinates (WGS 84):
- Phase II Unit 3, Unit 1, Unit 2: 40.10626, 124.31927
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
|---|---|---|---|---|---|---|
| Phase II Unit 3 | Construction[2][3] | coal: unknown[3] | 660[4] | ultra-supercritical[1] | – | 2027 (planned)[2] |
| Unit 1 | Operating | coal: unknown | 300 | subcritical | yes | 2012 |
| Unit 2 | Operating | coal: unknown | 300 | subcritical | yes | 2012 |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase II Unit 3 | Dandong Jinshan Thermoelectricity Co Ltd [100%][3] | Shenyang Jinshan Energy Co Ltd [100.0%] |
| Unit 1 | Dandong Jinshan Thermoelectricity Co Ltd [100%][3] | Shenyang Jinshan Energy Co Ltd [100.0%] |
| Unit 2 | Dandong Jinshan Thermoelectricity Co Ltd [100%][3] | Shenyang Jinshan Energy Co Ltd [100.0%] |
Project-level coal details
- Permit(s): 辽发改能源〔2024〕581号[3]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Dandong Jinshan power station is a two-unit coal-fired power plant with a total capacity of 600 MW in Liaoning Province. The plant was completed in 2012, and is owned by China Huadian.[5][6]
The permission for Phase II expansion was granted on 29 October 2024[7]. Biddings for equipment[8], design[9], and EPC[10][11] were active throughout 2025. Construction had been scheduled to start in September 2025[11].
Articles and Resources
References
- ↑ 1.0 1.1 https://mp.weixin.qq.com/s/SUuewQzj7uPEKqAXVHupAQ.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 https://mp.weixin.qq.com/s/DEcXXbTU_XqvzbdwiPiFcQ.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 https://fgw.ln.gov.cn/fgw/zfxxgk/fdzdgknr/xzzf/2024102917384143352/index.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ https://news.bjx.com.cn/html/20240705/1387283.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ "中国神华山西河曲低热值煤发电获准", 中国能源报, 2013-01-07
- ↑ "华电丹东金山热电公司1号机组顺利通过168小时满负荷试运", 中国电力网, 2012-09-17
- ↑ "固定资产投资项目核准信息-华电丹东金山热电二期 1×660MW热电联产扩建工程项目". 辽宁省发展和改革委员会网站. 2024-10-29. Retrieved 2025-8-28.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "哈电集团中标10个火电项目、2个抽水蓄能项目". 北极星火力发电网. 2025-02-14. Retrieved 2025-8-28.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "丹东二期1×660MW热电联产扩建工程勘察设计服务中标结果公示". 北极星火力发电网. 2025-03-17. Retrieved 2025-8-28.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "华电丹东金山热电二期1×660MW热电联产扩建工程监理服务招标公告". 北极星火力发电网. 2025-04-07. Retrieved 2025-8-28.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ 11.0 11.1 "华电丹东金山热电二期1×660MW热电联产扩建工程B标段烟囱施工招标公告". 火电之声 WeChat Official Accounts Platform. 2025-8-23. Retrieved 2025-8-28.
{{cite web}}: Check date values in:|access-date=and|date=(help)CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.