Datang Douhe power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Datang Douhe power station (大唐国际陡河发电厂) is an operating power station of at least 1320-megawatts (MW) in Ciyutuo Town, Luanzhou, Tangshan, Hebei, China. It is also known as 大唐国际陡河发电厂电联产等容量替代项目 (Unit 1), 大唐国际陡河2×660兆瓦燃煤热电联产等容量替代项目, 大唐国际茨榆坨热电.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Datang Douhe power station Ciyutuo Town, Luanzhou, Tangshan, Hebei, China 39.771091, 118.271667 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 39.771091, 118.271667

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Emergency/Backup
Unit 1 Operating[2] coal: bituminous[1][3] 660[1] ultra-supercritical[1] yes[1] 2025[2] False
Unit 2 Operating[4] coal: bituminous[1][3] 660[1] ultra-supercritical[1] yes[1] 2025[4] False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Datang International Power Generation Co Ltd [100%][1] Datang International Power Generation Co Ltd [100.0%]
Unit 2 Datang International Power Generation Co Ltd [100%][1] Datang International Power Generation Co Ltd [100.0%]

Project-level coal details

  • Coal source(s): domestic

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

In June 2019 it was reported the 2 x 300 MW Datang Tangshan power station-2 would be relocated to a less populous area, under the new name Datang Tangshan Ciyutuo power station. The new plant will be 2 x 350 MW and located north of the Western District of Quzhou Economic Development Zone in Ciyutuo Town.[5]

In 2021 the planned capacity of the plant was increased to 2 x 660 MW. It is planned for operation in 2023.[6]

No official permit information can be found apart from calls for bidding indicating the permit was granted by the Hebei Provincial Development and Reform Commission in 2022 with permit number 冀发改能源核字〔2022〕25号.[7][8]

The project was on 2023 Hebei Province key construction projects list.[9] Construction started in mid-2023.[10] The project was reportedly being built at Datang Douhe retired units site. China Energy Engineering Corporation Huabei Branch won the bid for the project engineering survey and design.[11] On 4 July 2023, Datang's official Weibo account showed pictures of construction progress of Douhe power station and concrete poured foundation could be seen.[12]

Major construction milestones for Unit 1 in 2024 included the concrete pouring of the chimney base[13][14], cooling tower construction[15], and boiler structural installation[16]. The generator stator and rotor were installed by early 2025[17], and the turbine was bucked[18]. Unit 1 achieved boiler ignition[19] and grid connection in the first half of 2025[20], and successfully completed its 168-hour trial run in June 2025[21].

Unit 2 progressed with similar milestones, including boiler frame erection in late 2023[22], main plant construction, and turbine bucking in 2025[23], followed by grid connection[24] and successful trial operation by October 2025[25].

In 2023, the chimney foundation was poured in November. In March 2024, cooling tower construction began. In May 2024, Unit 1 boiler steel structure installation, boiler topping, beam hoisting, and cooling tower construction progressed. In June 2024, the smart plant platform bidding began. In July 2024, the chimney was topped out. In September 2024, generator stator placement and boiler hydrostatic test succeeded. In December 2024, the rotor was installed. In January 2025, turbine cylinder work was completed. In March 2025, boiler ignition succeeded. In May 2025, turbine spin succeeded. Unit 1 completed its 168-hour trial run in June 2025[26].

In October 2023, Unit 2 boiler steel was erected. In November 2024, the generator stator was placed, and boiler hydrostatic test succeeded. In March 2025, turbine cylinder work was completed. In July 2025, steam blowing was completed. In August 2025, grid connection succeeded. Unit 2 completed its 168-hour trial run in October 2025[27].

Articles and Resources

References

  1. ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 https://news.bjx.com.cn/html/20220530/1229027.shtml. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 https://news.bjx.com.cn/html/20250701/1448803.shtml. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.0 4.1 https://mp.weixin.qq.com/s/7UrLnof6CxKeNHSEsDku6Q. {{cite web}}: Missing or empty |title= (help)
  5. ↑ "大唐河北唐山“退城搬迁”热电联产项目环境影响评价第一次公示," Luanzhou 2019-06-25
  6. ↑ "唐山热电公司要搬迁了?来看看!网友:搬迁后外环内还有厂子吗?," 丁梦桐娱乐厅, 2021-03-16
  7. ↑ "大唐国际陡河发电厂2X660MW燃煤热电联产等容量替代项目再生水供水管网(城区段、厂区段)工程施工招标公告". 电力招标网. 2023-06-19. Retrieved 2023-8-30. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  8. ↑ "大唐国际陡河发电厂2X660MW燃煤热电联产等容量替代项目2号机组及相关工程招标". 北极星火力发电网. 2023-03-29. Retrieved 2023-8-30. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  9. ↑ "河北省2023年省重点项目建设名单" (PDF). 河北省发改委网站. 2023-1-16. Retrieved 2023-8-30. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  10. ↑ "2×660MW!大唐国际陡河热电联产等容量替代项目主体施工". 能源电力新观察. 2023-07-23. Retrieved 2023-8-30. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  11. ↑ "大唐陡河发电厂2×660兆瓦燃煤热电联产等容量替代工程启动". 中国电力网. 2022-07-27. Retrieved 2023-8-30. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  12. ↑ "#大唐陡河热电分公司燃煤热电联产项目开工#". Datang Weibo. 2023-7-4. Retrieved 2023-8-30. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  13. ↑ "烟囱基础混凝土正式浇筑". WeChat. 2023-11-12. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  14. ↑ "烟囱基础混凝土正式浇筑". BJX. 2023-11-16. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  15. ↑ "中国能建天津电建承建的河北陡河热电工程项目部一号冷却塔下环梁开始浇筑". WeChat. 2024-03-29. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  16. ↑ "陡河热电分公司2×660兆瓦项目建设"加满油"". BJX. 2024-05-15. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  17. ↑ "陡河热电公司2×660MW项目建设现场传来捷报,1号发电机转子一次穿装成功". BJX. 2025-01-08. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  18. ↑ "大唐国际陡河发电厂2×660兆瓦燃煤热电联产等容量替代项目1号机组汽轮机扣盖圆满完成". WeChat. 2025-01-15. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  19. ↑ "河北陡河热电工程项目1号机组锅炉点火一次成功". WeChat. 2025-03-25. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  20. ↑ "河北大唐国际陡河发电厂2*660兆瓦燃煤热电联产等容量替代项目1号汽轮机冲转一次成功". WeChat. 2025-05-18. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  21. ↑ "陡河热电公司2台660兆瓦燃煤热电联产项目1号机组顺利通过168小时满负荷试运行,正式投产". BJX. 2025-07-01. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  22. ↑ "大唐国际陡河2×660 MW热电联产等容量替代项目2号锅炉第一根钢架顺利吊装就位". WeChat. 2023-10-13. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  23. ↑ "大唐国际陡河2×660MW热电联产项目2号机组汽轮机扣缸任务圆满完成". WeChat. 2025-03-05. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  24. ↑ "中电建核电公司承建的大唐国际陡河2×660MW热电联产项目2号机组首次并网一次成功". BJX. 2025-08-25. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  25. ↑ "陡河热电公司2×660兆瓦燃煤热电联产项目2号机组通过168小时满负荷试运行". WeChat. 2025-10-18. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  26. ↑ "陡河热电公司2台660兆瓦燃煤热电联产项目1号机组顺利通过168小时满负荷试运行,正式投产". 北极星电力网. 2025-06-30. Retrieved 2025-07-01.{{cite web}}: CS1 maint: url-status (link)
  27. ↑ "陡河热电公司2×660兆瓦燃煤热电联产项目2号机组通过168小时满负荷试运行". 微信公众平台. 2025-10-18. Retrieved 2025-10-30.{{cite web}}: CS1 maint: url-status (link)