Fuxin Coal gasification power station (大唐国际阜新煤制天然气公司动力岛) is an operating power station of at least 100-megawatts (MW) in Changyingzi Town, Xinqiu District, Fuxin, Liaoning, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Fuxin Coal gasification power station Changyingzi Town, Xinqiu District, Fuxin, Liaoning, China 42.053821, 121.827257 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase I Unit 3, Phase II Unit 4, Phase III Unit 5: 42.053821, 121.827257

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Phase I Unit 1 Operating coal: unknown 50 subcritical 2020
Phase I Unit 2 Operating coal: unknown 50 subcritical 2020
Phase I Unit 3 Cancelled coal: unknown 30 subcritical
Phase II Unit 4 Cancelled coal: unknown 30 subcritical
Phase III Unit 5 Cancelled coal: unknown 30 subcritical

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Liaoning Datang International Fuxin COAL-TO-SNG Co Ltd [100%] China Datang Corp Ltd [35.0%]; China Guoxin Holding Corp [35.0%]; China Chengtong Holdings Group Ltd [30.0%]
Phase I Unit 2 Liaoning Datang International Fuxin COAL-TO-SNG Co Ltd [100%] China Datang Corp Ltd [35.0%]; China Guoxin Holding Corp [35.0%]; China Chengtong Holdings Group Ltd [30.0%]
Phase I Unit 3 Liaoning Datang International Fuxin COAL-TO-SNG Co Ltd [100%] China Datang Corp Ltd [35.0%]; China Guoxin Holding Corp [35.0%]; China Chengtong Holdings Group Ltd [30.0%]
Phase II Unit 4 Liaoning Datang International Fuxin COAL-TO-SNG Co Ltd [100%] China Datang Corp Ltd [35.0%]; China Guoxin Holding Corp [35.0%]; China Chengtong Holdings Group Ltd [30.0%]
Phase III Unit 5 Liaoning Datang International Fuxin COAL-TO-SNG Co Ltd [100%] China Datang Corp Ltd [35.0%]; China Guoxin Holding Corp [35.0%]; China Chengtong Holdings Group Ltd [30.0%]

Project-level captive use details

  • Captive industry use (heat or power): both
  • Captive industry: Chemicals


Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

In 2012 China Datang was planning a 400 MW coal-fired plant in Fuxin city.[1] The power station was a coal gasification plant.[2]

However, by 2014 there had been no developments on the project, which was apparently abandoned. Instead, Datang began building a 4 billion cubic meter/year coal gasification plant in Fuxin, which the company had been trying to sell.[3]

As of 2018 China Datang was still owner of the coal gasification plant, with 190 MW of coal-fired power supporting the gasification. 100 MW of that capacity was under construction.[4]

Units 1-2 totaling 100 MW were commissioned in 2020.[5][6]

As of June 2021 there have been no developments on units 4-5, which appear to be cancelled. In June 2022, Phases II and III (Units 3-5) were officially cancelled by the Liaoning Provincial Development and Reform Commission.[7]