Datang Gaoyao Jintao Gas Thermal power station (大唐高要金淘燃气热电站) is an operating power station of at least 800-megawatts (MW) in Zhaoqing, Gaoyao, Guangdong, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Datang Gaoyao Jintao Gas Thermal power station Zhaoqing, Gaoyao, Guangdong, China 23.13353, 112.77838 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1-1, Unit 1-2, Unit 2-1, Unit 2-2: 23.13353, 112.77838

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit 1-1 operating[2] gas[3] 400[4] combined cycle[4] yes[2] 2018[2]
Unit 1-2 operating[2] gas[3] 400[4] combined cycle[4] yes[2] 2018[2]
Unit 2-1 shelved[5] gas[5] 700[5] combined cycle[5] not found
Unit 2-2 shelved[5] gas[5] 700[5] combined cycle[5] not found

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1-1 Datang International Power Generation Co., Ltd.[6][6] Datang International Power Generation Co., Ltd. [100.0%]
Unit 1-2 Datang International Power Generation Co., Ltd.[6][6] Datang International Power Generation Co., Ltd. [100.0%]
Unit 2-1 Datang International Power Generation Co., Ltd.[6][6] Datang International Power Generation Co., Ltd. [100.0%]
Unit 2-2 Datang International Power Generation Co., Ltd.[6][6] Datang International Power Generation Co., Ltd. [100.0%]

Background

The Phase 1 project (Unit 1-1 and Unit 1-2) received approval from the Guangdong Development and Reform Commission in December 2012. [7]In December 2018, the project officially started production, using the second West-East Gas Pipeline of China National Petroleum Corporation as its source of fuel.[8]

Phase 2 project: There has been no project progress information since November 2020.[9]

Articles and Resources

References

  1. https://web.archive.org/web/20210604203857/https://xyzp.haitou.cc/article/1701042.html. Archived from the original on 04 June 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 https://gas.in-en.com/html/gas-3001129.shtml. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://m.bjx.com.cn/mnews/20121204/405655.shtml. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 http://www.ichinaenergy.com/News/1/72193.html. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 https://www.bidcenter.com.cn/njrl/riliNjdateils-3-1310693.html. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 https://web.archive.org/web/20200605234213/http://www.dtpower.com/2017/0310/3061.shtml. Archived from the original on 05 June 2020. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. "大唐高要金淘天然气热电冷联产项目获核准". 2012-12-04. Retrieved 2023-10-20.{{cite web}}: CS1 maint: url-status (link)
  8. "广东高要金淘天然气热电冷联产项目2号机组投产发电". 2019-01-03. Retrieved 2023-10-20.{{cite web}}: CS1 maint: url-status (link)
  9. "大唐国际高要金淘天然气发电(二期)项目(广东大唐国际肇庆热电有限责任公司)". 2020-11-18. Retrieved 2023-10-20.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.