Datang Xinyu power station (大唐国际新余发电厂) is an operating power station of at least 440-megawatts (MW) in Guiyuzhou, Yushui, Xinyu, Jiangxi, China with multiple units, some of which are not currently operating. It is also known as 大唐国际新余第二发电公司 (Phase II Unit 1, Phase II Unit 2).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Datang Xinyu power station Guiyuzhou, Yushui, Xinyu, Jiangxi, China 27.7770329, 114.9091471 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2: 27.7770329, 114.9091471
  • Phase II Unit 1, Phase II Unit 2: 27.679755, 114.956506

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase I Unit 1 operating coal - anthracite 220 subcritical 1995
Phase I Unit 2 operating coal - anthracite 220 subcritical 1996
Phase II Unit 1 construction coal - anthracite 1000 ultra-supercritical
Phase II Unit 2 construction coal - anthracite 1000 ultra-supercritical

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase I Unit 1 Jiangxi Datang International Xinyu Power Generation Co Ltd [100.0%]
Phase I Unit 2 Jiangxi Datang International Xinyu Power Generation Co Ltd [100.0%]
Phase II Unit 1 Jiangxi Datang International Xinyu No.2 Power Generation Co Ltd [100.0%]
Phase II Unit 2 Jiangxi Datang International Xinyu No.2 Power Generation Co Ltd [100.0%]

Project-level coal details

  • Permit(s): December 18, 2015 – Also permitted in 2020

Background

The two existing coal-fired units of Datang Xinyu-1 power station, totaling 440 MW, were brought online between 1995 and 1996. The plant is owned by China Datang.[1]

Proposed expansion

Datang is planning to build two additional coal-fired units at the site, the Datang Xinyu-2 power station, with a total planned capacity of 2,000 MW.[1]

It was permitted for construction in 2015.[2]

As of May 2018, Planet satellite photos from April 2018 show no construction.

The project appears in the Jiangxi Province Development Plan of the Railway Economic Belt (2019-2025), released in October 2019.[3]

Various news sources reported that construction began between December 2021 and April 2022, but it was unclear what the construction involved.[4]

By June 2022, construction was confirmed underway.[5]