Datang Xinyu power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Datang Xinyu power station (大唐国际新余发电厂) is an operating power station of at least 440-megawatts (MW) in Guiyuzhou, Yushui, Xinyu, Jiangxi, China with multiple units, some of which are not currently operating. It is also known as 大唐国际新余第二发电公司 (Phase II Unit 1, Phase II Unit 2).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Datang Xinyu power station | Guiyuzhou, Yushui, Xinyu, Jiangxi, China | 27.7770329, 114.9091471 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2: 27.7770329, 114.9091471
- Phase II Unit 1, Phase II Unit 2: 27.679755, 114.956506
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Retired year |
---|---|---|---|---|---|---|
Phase I Unit 1 | operating | coal - anthracite | 220 | subcritical | 1995 | – |
Phase I Unit 2 | operating | coal - anthracite | 220 | subcritical | 1996 | – |
Phase II Unit 1 | construction | coal - anthracite | 1000 | ultra-supercritical | – | – |
Phase II Unit 2 | construction | coal - anthracite | 1000 | ultra-supercritical | – | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner |
---|---|
Phase I Unit 1 | Jiangxi Datang International Xinyu Power Generation Co Ltd [100.0%] |
Phase I Unit 2 | Jiangxi Datang International Xinyu Power Generation Co Ltd [100.0%] |
Phase II Unit 1 | Jiangxi Datang International Xinyu No.2 Power Generation Co Ltd [100.0%] |
Phase II Unit 2 | Jiangxi Datang International Xinyu No.2 Power Generation Co Ltd [100.0%] |
Project-level coal details
- Permit(s): December 18, 2015 – Also permitted in 2020
Background
The two existing coal-fired units of Datang Xinyu-1 power station, totaling 440 MW, were brought online between 1995 and 1996. The plant is owned by China Datang.[1]
Proposed expansion
Datang is planning to build two additional coal-fired units at the site, the Datang Xinyu-2 power station, with a total planned capacity of 2,000 MW.[1]
It was permitted for construction in 2015.[2]
As of May 2018, Planet satellite photos from April 2018 show no construction.
The project appears in the Jiangxi Province Development Plan of the Railway Economic Belt (2019-2025), released in October 2019.[3]
Various news sources reported that construction began between December 2021 and April 2022, but it was unclear what the construction involved.[4]
By June 2022, construction was confirmed underway.[5]
Articles and Resources
References
- ↑ 1.0 1.1 "安源煤业与大唐国际签订合作协议确定大唐国际 新余发电厂异地扩建和新余简家煤矿两个项目",华夏经纬网, 2014-05-21
- ↑ "大唐新余二期扩建项目环境影响报告书拟批准公示," 11-15-2017
- ↑ "江西省人民政府关于印发江西省高铁经济带发展规划(2019-2025年)的通知," Jiangxi government, 2019-10-08
- ↑ Examples: https://news.bjx.com.cn/html/20220331/1214519.shtml, https://www.sohu.com/a/510881295_121090399, http://jx.people.com.cn/n2/2022/0425/c190181-35239420.html, http://www.smedianews.com/NewsContents_46822.html, http://www.andegcj.cn/NewsView.aspx?id=5206
- ↑ 大唐新余二期异地扩建2×100万千瓦工程正式开工, power.in-en, 2022-06-27