Dayang Pumped Storage hydroelectric plant
From Global Energy Monitor
| Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Dayang Pumped Storage hydroelectric plant (大洋抽水蓄能电站) is an announced hydroelectric power plant in Wujingfu, Jiexi, Jieyang, Guangdong, China.
Project Details
Table 1: Project details for Dayang Pumped Storage hydroelectric plant
| Status | Nameplate capacity | Technology type | Owner |
|---|---|---|---|
| Announced[1] | 1200 MW[1] | Pumped storage[1] | China Southern Power Grid Energy Storage Co Ltd [100%] (南方电网储能股份有限公司)[1] |
Location
Table 2: Location details for Dayang Pumped Storage hydroelectric plant
| Location | Coordinates (WGS 84) |
|---|---|
| Wujingfu, Jiexi, Jieyang, Guangdong, China[1] | 23.5609, 116.0746 (approximate)[1] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20241002200730/https://www.seetao.com/details/207349.html. Archived from the original on 2024-10-02.
{{cite web}}: Missing or empty|title=(help)
