Diantou power station (陕煤集团黄陵矿业店头发电厂) is an operating power station of at least 1320-megawatts (MW) in Diantou Town, Huangling, Yan'an, Shaanxi, China with multiple units, some of which are not currently operating. It is also known as 陕煤黄陵店头电厂二期2×1000MW机组扩建项目 (Phase II Unit 3 & 4).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Diantou power station Diantou Town, Huangling, Yan'an, Shaanxi, China 35.657848, 109.050538 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 35.657848, 109.050538

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase I Unit 1 operating coal - unknown 660 ultra-supercritical 2023
Phase I Unit 2 operating coal - unknown 660 ultra-supercritical 2023
Phase II Unit 3 permitted coal - unknown 1000 ultra-supercritical
Phase II Unit 4 permitted coal - unknown 1000 ultra-supercritical

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase I Unit 1 Shaanxi Huangling Power Generation Co Ltd [100.0%]
Phase I Unit 2 Shaanxi Huangling Power Generation Co Ltd [100.0%]
Phase II Unit 3 Shaanxi Huangling Power Generation Co Ltd [100.0%]
Phase II Unit 4 Shaanxi Huangling Power Generation Co Ltd [100.0%]

Project-level coal details

  • Permit(s): October 17, 2022[1], October 17, 2022[1], March 2020

Background on Project

Huangling Coal Mining applied for environmental clearance to build a 2 x 660 MW coal plant in Huangling.[2] The EIA of the power plant was approved by the Shaanxi provincial EPA in September 2016.[3]

There were no further developments on the project until March 2019, when sponsor Huangling Coal Mining again discussed plans for the project.[4] As of March 2020 Huangling Coal Mining had completed the pre-feasibility study and was seeking environmental clearance.[5] The project was permitted in March 2020, with operation planned for 2023.[6][7]

Construction began on unit 1 in May 2021.[8] Unit 2 also appeared to be underway.

By October 2022, a second 2 x 1,000 MW phase was permitted. The first phase was still under construction.[9]

In May 2023, it was reported that construction of the first phase was nearly complete.[10] By the end of the same month, Unit 1 had begun operation.[11] In June 2023, Unit 2 also successfully connected to the grid and began operating.[12][13][14]

Articles and Resources

References

  1. 1.0 1.1 https://web.archive.org/web/20240125141645/https://news.bjx.com.cn/html/20221021/1262762.shtml. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. "关于“黄陵矿业集团有限责任公司店头电厂2×660MW工程”项目环境影响报告书全文公示信息," Huangling Coal Mining, 2016-5-23
  3. "黄陵矿业集团店头电厂2×660MW工程取得环评批复"Huangling Mining Group, 2016-09-13
  4. "黄陵矿业公司2019年基本建设工作都有哪些新要求发布时间," Huangling Coal Mining, 2019-03-29
  5. "陕北—湖北特高压通道配套煤电规划获国家能源局批复,预计配置新能源项目6GW," SolarBe, 2020-03-08
  6. "陕北至湖北特高压配套4个大型火电项目已获核准 2个项目计划今年开工," 北极星电力网新闻中心, 2020/3/13
  7. "陕煤黄陵店头电厂2×660MW工程项目预计2022年底投产," china5e, 2021-08-26
  8. "2×660MW!陕西省一大型火电项目开工," Sohu, 2021-05-18
  9. "黄陵店头电厂二期2×1000MW机组扩建项目喜获核准批复," BJX, 2022-10-21
  10. 陕煤集团:黄陵矿业2×660MW电厂项目进入冲刺阶段 , Sohu News, 2023-05-12
  11. 陕西黄陵发电公司2×660兆瓦电厂项目1号机组投产, BJX, May 29, 2023
  12. 陕西黄陵2×660MW电厂项目2号机组首次并网一次成功, BJX, 2023-06-15
  13. 黄陵矿业2×660MW电厂项目实现“双机双投”, BJX, 2023-06-28
  14. 【项目】火电|2x1000MW!浙能嘉兴四期扩建9号机组EPC总承包开标/2×660MW!陕煤黄陵矿业电厂实现“双机双投”, MP Weixin, 2023-06-29