Dogger Bank wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: formerly Creyke Beck B, Dogger Bank A & B (was Creyke Beck A & B), Dogger Bank B, Dogger Bank Creyke Beck B offshore wind farm, formerly Teesside C, Dogger Bank A & B (was Creyke Beck A & B), Dogger Bank Creyke Beck C offshore wind farm, Cluaran Deas Ear (E3), Cluaran Deas Ear (Thistle South East)

Dogger Bank wind farm is a wind farm in pre-construction in United Kingdom.

Project Details

Table 1: Phase-level project details for Dogger Bank wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
A Construction[1] 2023 (planned)[2] 1200 MW[3] Offshore hard mount[4] SSE Renewables [40%]; Equinor ASA [40%]; Vårgrønn AS [20%][2] Equinor ASA[3]
B Construction[1] 2024 (planned)[2] 1200 MW[3] Offshore hard mount[4] SSE Renewables [40%]; Equinor [40%]; Vårgrønn AS [20%][2] Equinor ASA[3]
C Construction[1] 2026 (planned)[2] 1200 MW[3] Offshore hard mount[4] SSE Renewables [40%]; Equinor ASA [40%]; Eni SPA [20%][5] Equinor ASA[3]
D Pre-construction[6] 2026 (planned)[2] 1320 MW[4] Offshore hard mount[4] SSE Renewables [50%]; Equinor [50%][2] Equinor ASA[4]

Location

Table 2: Phase-level location details for Dogger Bank wind farm

Phase Name Location Coordinates (WGS 84)
A United Kingdom 55.9673, 1.6679 (exact)[1]
B United Kingdom 55.9673, 1.6679 (exact)[1]
C United Kingdom 55.9673, 1.6679 (exact)[1]
D England, United Kingdom[2] 55.9673, 1.6679 (approximate)[4]

The map below shows the locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "Renewable Energy Planning Database". United Kingdom Government. March, 2021. Archived from the original on June 21, 2021. Retrieved May 24, 2021. {{cite web}}: Check date values in: |date= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://www.sserenewables.com/offshore/projects/dogger-bank/. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 https://www.sserenewables.com/offshore-wind/projects/dogger-bank/. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 https://www.equinor.com/news/20230206-early-scoping-work-potential-4th-phase-dogger-bank-wind-farm. {{cite web}}: Missing or empty |title= (help)
  5. https://renews.biz/73327/eni-takes-20-slice-of-dogger-bank-c/. {{cite web}}: Missing or empty |title= (help)
  6. https://ieefa.org/articles/sse-equinor-looking-build-fourth-phase-worlds-largest-offshore-wind-farm. {{cite web}}: Missing or empty |title= (help)