Dogger Bank wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: formerly Creyke Beck B, Dogger Bank A & B (was Creyke Beck A & B), Dogger Bank B, Dogger Bank Creyke Beck B offshore wind farm, formerly Teesside C, Dogger Bank A & B (was Creyke Beck A & B), Dogger Bank Creyke Beck C offshore wind farm, Cluaran Deas Ear (E3), Cluaran Deas Ear (Thistle South East)
Dogger Bank wind farm is a wind farm in pre-construction in United Kingdom.
Project Details
Table 1: Phase-level project details for Dogger Bank wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
A | Construction[1] | 2023 (planned)[2] | 1200 MW[3] | Offshore hard mount[4] | SSE Renewables [40%]; Equinor ASA [40%]; Vårgrønn AS [20%][2] | Equinor ASA[3] |
B | Construction[1] | 2024 (planned)[2] | 1200 MW[3] | Offshore hard mount[4] | SSE Renewables [40%]; Equinor [40%]; Vårgrønn AS [20%][2] | Equinor ASA[3] |
C | Construction[1] | 2026 (planned)[2] | 1200 MW[3] | Offshore hard mount[4] | SSE Renewables [40%]; Equinor ASA [40%]; Eni SPA [20%][5] | Equinor ASA[3] |
D | Pre-construction[6] | 2026 (planned)[2] | 1320 MW[4] | Offshore hard mount[4] | SSE Renewables [50%]; Equinor [50%][2] | Equinor ASA[4] |
Location
Table 2: Phase-level location details for Dogger Bank wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
A | United Kingdom | 55.9673, 1.6679 (exact)[1] |
B | United Kingdom | 55.9673, 1.6679 (exact)[1] |
C | United Kingdom | 55.9673, 1.6679 (exact)[1] |
D | England, United Kingdom[2] | 55.9673, 1.6679 (approximate)[4] |
The map below shows the locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 "Renewable Energy Planning Database". United Kingdom Government. March, 2021. Archived from the original on June 21, 2021. Retrieved May 24, 2021.
{{cite web}}
: Check date values in:|date=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://www.sserenewables.com/offshore/projects/dogger-bank/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 https://www.sserenewables.com/offshore-wind/projects/dogger-bank/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 https://www.equinor.com/news/20230206-early-scoping-work-potential-4th-phase-dogger-bank-wind-farm.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://renews.biz/73327/eni-takes-20-slice-of-dogger-bank-c/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://ieefa.org/articles/sse-equinor-looking-build-fourth-phase-worlds-largest-offshore-wind-farm.
{{cite web}}
: Missing or empty|title=
(help)