Dogger Bank wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Cluaran Deas Ear (E3), formerly Teesside C, Dogger Bank B, Cluaran Deas Ear (Thistle South East), Dogger Bank Creyke Beck C offshore wind farm, formerly Creyke Beck B, Dogger Bank A & B (was Creyke Beck A & B), Dogger Bank Creyke Beck B offshore wind farm

Dogger Bank wind farm is a wind farm under construction in United Kingdom.


Project Details

Table 1: Phase-level project details for Dogger Bank wind farm

Phase name Status Commissioning year Nameplate capacity Mount type Owner Operator
A Construction[1] 2023 (planned)[2] 1200[3] Offshore hard mount SSE Renewables [40%]; Equinor ASA [40%]; Vårgrønn AS [20%][2] Equinor ASA[3]
B Construction[1] 2024 (planned)[2] 1200[3] Offshore hard mount SSE Renewables [40%]; Equinor [40%]; Vårgrønn AS [20%][2] Equinor ASA[3]
C Construction[1] 2026 (planned)[2] 1200[3] Offshore hard mount SSE Renewables [40%]; Equinor ASA [40%]; Eni SPA [20%][4] Equinor ASA[3]
D Pre-construction[5] 2026 (planned)[2] 1320[6] Offshore hard mount SSE Renewables [50%]; Equinor [50%][2] Equinor ASA[6]


Location

Table 2: Phase-level location details for Dogger Bank wind farm

Phase name Location Coordinates (WGS 84)
A United Kingdom 55.9673, 1.6679 (exact)[1]
B United Kingdom 55.9673, 1.6679 (exact)[1]
C United Kingdom 55.9673, 1.6679 (exact)[1]
D England, United Kingdom[2] 55.9673, 1.6679 (approximate)[6]

The map below shows the location of the wind farm phases:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "Renewable Energy Planning Database". United Kingdom Government. January 31, 2023. Archived from the original on February 26, 2023. Retrieved April 2023. {{cite web}}: Check date values in: |access-date= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://web.archive.org/web/20230307100849/https://www.sserenewables.com/offshore/projects/dogger-bank/. Archived from the original on March 07, 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 "Dogger Bank Offshore Wind Farm". Archived from the original on May 10, 2021. Retrieved August 23, 2021.
  4. https://web.archive.org/web/20211105224839/https://renews.biz/73327/eni-takes-20-slice-of-dogger-bank-c/. Archived from the original on November 05, 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. https://web.archive.org/web/20230103162529/https://ieefa.org/articles/sse-equinor-looking-build-fourth-phase-worlds-largest-offshore-wind-farm. Archived from the original on January 03, 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. 6.0 6.1 6.2 https://web.archive.org/web/20230208085226/https://www.equinor.com/news/20230206-early-scoping-work-potential-4th-phase-dogger-bank-wind-farm. Archived from the original on February 08, 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)