Dohoku wind farm is a wind farm in pre-construction in Hokkaido Prefecture, Japan.

Project Details

Table 1: Phase-level project details for Dohoku wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner
1 Pre-construction[1] 2023 (planned)[1] 60 MW[1][2] Onshore[1] Eurus Energy[1]
2 Pre-construction[1] 2023 (planned)[1] 60 MW[1][2] Onshore[1] Eurus Energy[1]
3 Pre-construction[1] 2023 (planned)[1] 105 MW[1][2] Onshore[1] Eurus Energy[1]
4 Pre-construction[1] 2023 (planned)[1] 105 MW[1][2] Onshore[1] Eurus Energy[1]

Location

Table 2: Phase-level location details for Dohoku wind farm

Phase Name Location Coordinates (WGS 84)
1 Hokkaido Prefecture, Japan[1] 43.1773, 140.9389 (approximate)[1]
2 Hokkadio Prefecture, Japan[1] 43.1773, 140.9389 (approximate)[1]
3 Hokkadio Prefecture, Japan[1] 43.1773, 140.9389 (approximate)[1]
4 Hokkadio Prefecture, Japan[1] 43.1773, 140.9389 (approximate)[1]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 https://web.archive.org/web/20210621175138/https://renewablesnow.com/news/siemens-gamesa-to-send-typhoon-proof-turbines-for-339-mw-wind-cluster-in-japan-744806/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://www.siemensgamesa.com/newsroom/2021/06/siemens-gamesa-press-release-japan-typoon-proof. {{cite web}}: Missing or empty |title= (help)