Dongguan Zhongtang Gas Thermal power station
From Global Energy Monitor
| Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
| Related categories: |
Dongguan Zhongtang Gas Thermal power station (东莞中堂燃气热电厂) is an operating power station of at least 1720-megawatts (MW) in Wujiayong, Zhongtang Town, Dongguan, Guangdong, China.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Dongguan Zhongtang Gas Thermal power station | Wujiayong, Zhongtang Town, Dongguan, Guangdong, China | 23.1173384, 113.677319 (exact)[1][2] |
Unit-level coordinates (WGS 84):
- 1-1, 1-2, 2-1, 2-2: 23.1173384, 113.677319
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Equipment | Emergency/Backup |
|---|---|---|---|---|---|---|---|---|
| 1-1 | Operating[3] | fossil gas: natural gas[4] | 400[5] | combined cycle[6] | yes[4] | 2021[7] | – | no |
| 1-2 | Operating[8][9] | fossil gas: natural gas[4] | 400[5] | combined cycle[6] | yes[4] | 2021[7] | Dongfang Electric Corporation: F4++[10] | no |
| 2-1 | Operating[11] | fossil gas: natural gas[12] | 460[13] | combined cycle[13] | yes[13] | 2022[14] | – | no |
| 2-2 | Operating[11] | fossil gas: natural gas[12] | 460[13] | combined cycle[13] | yes[13] | 2022[15][16] | – | no |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| 1-1 | Dongguan Yueming New Energy Thermal Power Co Ltd [100%][17][18][19] | Guangdong Aoran Energy Development Co Ltd [35.9%]; Huangyong Stock Economic Union, Zhongtang Town, Dongguan City [18.0%]; Dongguan Dongtang Group Co Ltd [11.9%]; Jianhui International Industrial Co Ltd [11.4%]; Dongguan Dongtang Group Co Ltd Trade Union Committee [7.7%]; unknown [5.0%]; Dongguan Zhongying New Energy Investment Co Ltd [2.6%]; Dongguan Hengtai Zhihe Industrial Investment Co Ltd [1.7%]; Dongguan Fucheng Cultural Industrial Park Co Ltd [1.4%]; Dongguan Yuesheng New Energy Investment Co Ltd [1.1%]; Dongguan Hongneng Industrial Investment Co Ltd [1.0%]; Dongguan Chunyao Industrial Investment Co Ltd [0.7%]; Guangdong Knox Energy Technology Co Ltd [0.7%]; Guangdong Xujing Technology Co Ltd [0.4%]; Dongguan Kaidelin Paper Co Ltd [0.3%]; Dongguan Kaiyuerui Equity Investment Co Ltd [0.2%]; Dongguan Weifeng Construction Engineering Co Ltd [0.1%] |
| 1-2 | Dongguan Yueming New Energy Thermal Power Co Ltd [100%][17][18][19] | Guangdong Aoran Energy Development Co Ltd [35.9%]; Huangyong Stock Economic Union, Zhongtang Town, Dongguan City [18.0%]; Dongguan Dongtang Group Co Ltd [11.9%]; Jianhui International Industrial Co Ltd [11.4%]; Dongguan Dongtang Group Co Ltd Trade Union Committee [7.7%]; unknown [5.0%]; Dongguan Zhongying New Energy Investment Co Ltd [2.6%]; Dongguan Hengtai Zhihe Industrial Investment Co Ltd [1.7%]; Dongguan Fucheng Cultural Industrial Park Co Ltd [1.4%]; Dongguan Yuesheng New Energy Investment Co Ltd [1.1%]; Dongguan Hongneng Industrial Investment Co Ltd [1.0%]; Dongguan Chunyao Industrial Investment Co Ltd [0.7%]; Guangdong Knox Energy Technology Co Ltd [0.7%]; Guangdong Xujing Technology Co Ltd [0.4%]; Dongguan Kaidelin Paper Co Ltd [0.3%]; Dongguan Kaiyuerui Equity Investment Co Ltd [0.2%]; Dongguan Weifeng Construction Engineering Co Ltd [0.1%] |
| 2-1 | Dongguan Yueming New Energy Thermal Power Co Ltd [100%][17][18][19] | Guangdong Aoran Energy Development Co Ltd [35.9%]; Huangyong Stock Economic Union, Zhongtang Town, Dongguan City [18.0%]; Dongguan Dongtang Group Co Ltd [11.9%]; Jianhui International Industrial Co Ltd [11.4%]; Dongguan Dongtang Group Co Ltd Trade Union Committee [7.7%]; unknown [5.0%]; Dongguan Zhongying New Energy Investment Co Ltd [2.6%]; Dongguan Hengtai Zhihe Industrial Investment Co Ltd [1.7%]; Dongguan Fucheng Cultural Industrial Park Co Ltd [1.4%]; Dongguan Yuesheng New Energy Investment Co Ltd [1.1%]; Dongguan Hongneng Industrial Investment Co Ltd [1.0%]; Dongguan Chunyao Industrial Investment Co Ltd [0.7%]; Guangdong Knox Energy Technology Co Ltd [0.7%]; Guangdong Xujing Technology Co Ltd [0.4%]; Dongguan Kaidelin Paper Co Ltd [0.3%]; Dongguan Kaiyuerui Equity Investment Co Ltd [0.2%]; Dongguan Weifeng Construction Engineering Co Ltd [0.1%] |
| 2-2 | Dongguan Yueming New Energy Thermal Power Co Ltd [100%][17][18][19] | Guangdong Aoran Energy Development Co Ltd [35.9%]; Huangyong Stock Economic Union, Zhongtang Town, Dongguan City [18.0%]; Dongguan Dongtang Group Co Ltd [11.9%]; Jianhui International Industrial Co Ltd [11.4%]; Dongguan Dongtang Group Co Ltd Trade Union Committee [7.7%]; unknown [5.0%]; Dongguan Zhongying New Energy Investment Co Ltd [2.6%]; Dongguan Hengtai Zhihe Industrial Investment Co Ltd [1.7%]; Dongguan Fucheng Cultural Industrial Park Co Ltd [1.4%]; Dongguan Yuesheng New Energy Investment Co Ltd [1.1%]; Dongguan Hongneng Industrial Investment Co Ltd [1.0%]; Dongguan Chunyao Industrial Investment Co Ltd [0.7%]; Guangdong Knox Energy Technology Co Ltd [0.7%]; Guangdong Xujing Technology Co Ltd [0.4%]; Dongguan Kaidelin Paper Co Ltd [0.3%]; Dongguan Kaiyuerui Equity Investment Co Ltd [0.2%]; Dongguan Weifeng Construction Engineering Co Ltd [0.1%] |
Project-level captive use details
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Articles and Resources
References
- ↑ "东莞市中堂燃气热电联产项目一期工程2号机组一次并网成功". 2021-12-14. Archived from the original on 2025-02-13. Retrieved 2024-10-24.
- ↑ https://www.planet.com/explorer/#/mosaic/431b62a0-eaf9-45e7-acf1-d58278176d52.global_monthly_2020_07_mosaic/center/113.663,23.111/zoom/15.53/geometry/POLYGON((113.7696+23.1033,113.7679+23.1194,113.7628+23.1349,113.7545+23.1492,113.7433+23.1617,113.7297+23.172,113.7142+23.1796,113.6973+23.1843,113.6798+23.1859,113.6623+23.1843,113.6454+23.1796,113.6299+23.172,113.6163+23.1617,113.6051+23.1492,113.5968+23.1349,113.5917+23.1194,113.5899+23.1033,113.5917+23.0872,113.5968+23.0717,113.6051+23.0574,113.6163+23.0449,113.6299+23.0346,113.6454+23.027,113.6623+23.0223,113.6798+23.0207,113.6973+23.0223,113.7142+23.027,113.7297+23.0346,113.7433+23.0449,113.7545+23.0574,113.7628+23.0717,113.7679+23.0872,113.7696+23.1033))/items/PSScene4Band%3A20200910_004418_1054,PSScene4Band%3A20200910_004417_1054,PSScene4Band%3A20200910_004416_1054,PSScene4Band%3A20200910_004415_1054/centerMarker/true.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20210927174221/https://news.bjx.com.cn/html/20210722/1165280.shtml. Archived from the original on 2021-09-27.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 https://web.archive.org/web/20210604213316/http://drc.gd.gov.cn/xmgg/content/post_2578357.html. Archived from the original on 2021-06-04.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 5.3 "东莞中堂燃气热电联产项目一期工程顺利投产-北极星电力新闻网". m.bjx.com.cn. 2021-12-30. Archived from the original on 2025-05-23. Retrieved 2024-10-24.
- ↑ 6.0 6.1 https://web.archive.org/web/20211121051617/https://news.bjx.com.cn/html/20180906/926153.shtml. Archived from the original on 2021-11-21.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.0 7.1 https://web.archive.org/web/20220708194149/https://news.bjx.com.cn/html/20211230/1196790.shtml. Archived from the original on 2022-07-08.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20210604205255/https://news.bjx.com.cn/html/20200723/1091447.shtml. Archived from the original on 2021-06-04.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20220711171933/https://news.bjx.com.cn/html/20211229/1196442.shtml. Archived from the original on 2022-07-11.
{{cite web}}: Missing or empty|title=(help) - ↑ "东莞中堂一期2号燃机首次点火成功 "德阳造"助力实现"双碳"目标". 2021-11-25. Archived from the original on 2025-06-27. Retrieved 2025-06-23.
- ↑ 11.0 11.1 "东莞市中堂燃气热电联产项目二期工程全面建成投产". 2022-05-25. Archived from the original on 2025-06-27. Retrieved 2025-026-23.
{{cite web}}: Check date values in:|access-date=(help) - ↑ 12.0 12.1 (PDF) https://web.archive.org/web/20210605000301/http://dgdp.dg.gov.cn/attachment/0/19/19522/3156360.pdf. Archived from the original (PDF) on 2021-06-05.
{{cite web}}: Missing or empty|title=(help) - ↑ 13.0 13.1 13.2 13.3 13.4 13.5 https://web.archive.org/web/20210603234447/http://www.dcywlm.com/bonews.php?id=102099. Archived from the original on 2021-06-03.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20220930232942/https://m.bjx.com.cn/mnews/20220525/1227767.shtml. Archived from the original on 2022-09-30.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20220708195229/https://news.bjx.com.cn/html/20220506/1222596.shtml. Archived from the original on 2022-07-08.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://web.archive.org/web/20220806112529/http://drc.gd.gov.cn/attachment/0/416/416781/3253184.pdf. Archived from the original (PDF) on 2022-08-06.
{{cite web}}: Missing or empty|title=(help) - ↑ 17.0 17.1 17.2 17.3 https://www.qcc.com/firm/87da86c62b9981a5c3b963f58481ab12.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 18.0 18.1 18.2 18.3 https://web.archive.org/web/20211106075009/http://www.gzebpubservice.cn/dlzbgg/342704.htm. Archived from the original on 2021-11-06.
{{cite web}}: Missing or empty|title=(help) - ↑ 19.0 19.1 19.2 19.3 "重大项目点击|中堂燃气热电联产项目二期工程". idg.timedg.com. 2022-07-22. Archived from the original on 2025-05-23. Retrieved 2024-10-24.
- ↑ 20.0 20.1 "实现全面投产!中堂燃气热电联产项目第二套机组顺利投产". webzdg.sun0769.com. 2022-05-30. Archived from the original on 2025-05-23. Retrieved 2024-10-24.
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.
