This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
|
Sub-articles:
|
|
Dongying–Guangrao Oil Pipeline 东营港-广饶原油, 成品油输油管道 is a proposed oil pipeline in China with segments that are under construction.
Location
The pipeline is proposed to run from Dongying to Guangrao.
Project details
Dongying–Haojia Segment 东营-郝家
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.399999999999999,"lon":118.40000000000001,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator:
- Owner:
- Parent company:
- Capacity: 16 mtpa
- Length: 103 kilometers
- Diameter: 711 millimeters
- Status: Construction (2016)
- Start year: originally 2017, now 2022
- Cost:
- Financing:
- Associated infrastructure:
Haojia–Guangrao Segment 郝家-广饶
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.399999999999999,"lon":118.40000000000001,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator:
- Owner:
- Parent company:
- Capacity: 20 mtpa
- Length: 47 kilometers
- Diameter: 711 millimeters
- Status: Construction (2016)
- Start year: originally 2017, now 2022
- Cost:
- Financing:
- Associated infrastructure:
Background
Construction appears to have begun on the segments in 2016 and was slated to be completed in 2017, and later 2018. However, as of March 2022, there is no evidence that the pipelines eventually were completed or became operational, so they are still presumed to be under construction.[1][2][3][4][5]
Articles and resources
References
Related GEM.wiki articles
External resources
External articles