Dongying FSRU
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Dongying FSRU LNG Terminal (东营海上浮式LNG接收站) is a proposed LNG terminal in Dongying, Shangdong, China. As of 2022 it is considered shelved.
Location
Project details
- Owner: Shanghai Hong Hua Oil and Gas Equipment Co., Ltd.
- Parent company:
- Location: Dongying, Shangdong, China
- Coordinates: 38.08051350159822, 119.03484310135437(approximate)
- Capacity: 3 mtpa
- Status: Shelved (2021)
- Type: Import
- Start year: 2022
Background
An LNG terminal in Dongying has been proposed and included in Shandong Province Gas Storage Facilities Development Plan (2018-2020). [1]
However, the State Oceanic Administration has suspended the acceptance and review of reclamation plan for an onshore LNG terminal in Bohai Bay since May 2017.
A floating storage regasification unit (FSRU) proposal was raised and discussed in 2019.[2] As of 2021, there had been no further evidence for development, and it is considered shelved.
Articles and resources
References
- ↑ "山东省储气设施规划建设方案(2018-2020年)的通知". www.sohu.com. 2018-12-18. Retrieved 2021-04-13.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "山东东营拟建海上平台式液化天然气LNG接收终端(PSRU)". gas.in-en.com. 2019-08-12. Retrieved 2021-04-13.
{{cite web}}
: CS1 maint: url-status (link)