Doungza Adias wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Karystia wind project

Doungza Adias wind farm (Ντουγκζα-Αντιας) is a wind farm under construction in Euboea Regional Unit, Central Greece, Thessaly and Central Greece, Greece.

Project Details

Table 1: Phase-level project details for Doungza Adias wind farm

Status Nameplate capacity Type Owner
Construction[1] 11 MW[2] Onshore[2] Terna Energy (Ενεργειακη Καφηρεως Ευβοιας Ανωνυμη Εταιρεια Παραγωγης Ηλεκτρικης Ενεργειας)[3]

Location

Table 2: Phase-level location details for Doungza Adias wind farm

Location Coordinates (WGS 84)
Euboea Regional Unit, Central Greece, Thessaly and Central Greece, Greece[2] 38.0593, 24.5594 (exact)[2]

The map below shows the exact location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. https://www.terna-energy.com/acivities/aioliki-energeia/karistia/?country=. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://geo.rae.gr/. {{cite web}}: Missing or empty |title= (help)
  3. (PDF) https://www.enterprisegreece.gov.gr/assets/content/files/c46/a4749/f615/%20%CE%A0%CE%91%CE%A1%CE%9A%CE%91_%CE%A4%CE%95%CE%A1%CE%9D%CE%91_%CE%94%CE%99%CE%91%CE%92%CE%9F%CE%A5%CE%9B%CE%95%CE%A5%CE%A3%CE%97.pdf. {{cite web}}: Missing or empty |title= (help)