Doungza Adias wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Karystia wind project
Doungza Adias wind farm (Ντουγκζα-Αντιας) is a wind farm under construction in Euboea Regional Unit, Central Greece, Thessaly and Central Greece, Greece.
Project Details
Table 1: Phase-level project details for Doungza Adias wind farm
Status | Nameplate capacity | Type | Owner |
---|---|---|---|
Construction[1] | 11 MW[2] | Onshore[2] | Terna Energy (Ενεργειακη Καφηρεως Ευβοιας Ανωνυμη Εταιρεια Παραγωγης Ηλεκτρικης Ενεργειας)[3] |
Location
Table 2: Phase-level location details for Doungza Adias wind farm
Location | Coordinates (WGS 84) |
---|---|
Euboea Regional Unit, Central Greece, Thessaly and Central Greece, Greece[2] | 38.0593, 24.5594 (exact)[2] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ https://www.terna-energy.com/acivities/aioliki-energeia/karistia/?country=.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 https://geo.rae.gr/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.enterprisegreece.gov.gr/assets/content/files/c46/a4749/f615/%20%CE%A0%CE%91%CE%A1%CE%9A%CE%91_%CE%A4%CE%95%CE%A1%CE%9D%CE%91_%CE%94%CE%99%CE%91%CE%92%CE%9F%CE%A5%CE%9B%CE%95%CE%A5%CE%A3%CE%97.pdf.
{{cite web}}
: Missing or empty|title=
(help)