Druiberg wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Bioenergie Nordharz (Phase 1)
Druiberg wind farm is an operating wind farm in Germany.
Project Details
Table 1: Phase-level project details for Druiberg wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Operator |
---|---|---|---|---|---|
1 | Operating[1] | 2004[1] | 14 MW[1] | Onshore[1] | General Renewables[1] |
2 | Operating[1] | 2004[1] | 12 MW[1] | Onshore[1] | General Renewables[1] |
3 | Operating[1] | 2004[1] | 12 MW[1] | Onshore[1] | General Renewables[1] |
Location
Table 2: Phase-level location details for Druiberg wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Germany[1] | 51.9924, 10.8323 (exact)[1] |
2 | Germany[1] | 51.9946, 10.8225 (exact)[1] |
3 | Germany[1] | 51.9871, 10.8241 (exact)[1] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 "Marktstammdatenregister (Market master data register)". Germany Federal Network Agency. 2023-02. Archived from the original on 2024-01-25. Retrieved 2023-02.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)