Dry Lake (Invenergy) Solar Energy Center
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Dry Lake (Invenergy) Solar Energy Center is an operating solar photovoltaic (PV) farm in Moapa, Clark County, Nevada, United States.
Project Details
Table 1: Phase-level project details for Dry Lake (Invenergy) Solar Energy Center
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Operating[1] | 2024[1] | 150 MWac[2] | PV[2] | Invenergy LLC [100%][3] | Invenergy[3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Dry Lake (Invenergy) Solar Energy Center
Location | Coordinates (WGS 84) |
---|---|
Moapa, Clark County, Nevada, United States[2] | 36.4260, -114.9230 (exact)[2] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://www.eia.gov/electricity/data/eia860m/xls/november_generator2024.xlsx https://www.eia.gov/electricity/data/eia860m/, https://www.eia.gov/electricity/data/eia860m/xls/november_generator2024.xlsx.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ 3.0 3.1 https://web.archive.org/web/20240206175753/https://invenergy.com/news/invenergy-completes-construction-financing-for-dry-lake-solar-energy-center. Archived from the original on 2024-02-06.
{{cite web}}
: Missing or empty|title=
(help)