Drzeżewo I-IV wind farm
From Global Energy Monitor
| This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Drzeżewo I-IV wind farm is an operating wind farm in Poland.
Project Details
Table 1: Phase-level project details for Drzeżewo I-IV wind farm
| Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
|---|---|---|---|---|---|
| Operating[1] | 2025[1] | 139 MW[2] | Onshore[3] | Grupa Polsat Plus; Zespół Elektrowni Pątnów Adamów Konin SA[4] | PAK-Polska Czysta Energia[5] |
Location
Table 2: Phase-level location details for Drzeżewo I-IV wind farm
| Location | Coordinates (WGS 84) |
|---|---|
| Poland[3] | 54.4839, 17.4709 (approximate)[3] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://grupapolsatplus.pl/en/archive/polsat-plus-group-has-completed-installation-work-drzezewo-third-largest-wind-farm-poland.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20240219010948/https://renews.biz/88639/vestas-wins-139mw-polish-order/. Archived from the original on 2024-02-19.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 (PDF) https://web.archive.org/web/20240126110155/https://onde.pl/wp-content/uploads/2023/01/EN_03_2023-Drzezewo-IV.pdf. Archived from the original (PDF) on 2024-01-26.
{{cite web}}: Missing or empty|title=(help) - ↑ https://grupapolsatplus.pl/en/archive/decision-taken-cyfrowy-polsat-sa-grant-loan-and-establish-collateral-execution-drzezewo-wind https://grupapolsatplus.pl/en/archive/decision-taken-cyfrowy-polsat-sa-grant-loan-and-establish-collateral-execution-drzezewo-wind, https://grupapolsatplus.pl/en/archive/decision-taken-cyfrowy-polsat-sa-grant-loan-and-establish-collateral-execution-drzezewo-wind.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ https://web.archive.org/web/20240131071506/https://grupapolsatplus.pl/en/archive/decision-taken-cyfrowy-polsat-sa-grant-loan-and-establish-collateral-execution-drzezewo-wind. Archived from the original on 2024-01-31.
{{cite web}}: Missing or empty|title=(help)
