Durgapur Coal Mine

From Global Energy Monitor
(Redirected from Durgapur Mine)
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

Durgapur Coal Mine is an operating coal mine in Chandrapur, Maharashtra, India.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Durgapur Coal Mine Chandrapur, Chandrapur, Maharashtra, India 20.0081, 79.2989 (approximate)

The map below shows the approximate location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Opening Year Closing Year
Operating 1980[1]

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
2.3[2] 2.5[3] 2023[3] Surface Open Pit 16.23[1] 50.0* 553*

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
47.0 50.0 Wardha Valley Subbituminous Thermal

Table 5: Ownership and parent company

Note: To access more comprehensive data on energy ownership, please visit the Global Energy Ownership Tracker.
Owner Parent Company Headquarters
Western Coalfields Ltd [100%][4] Coal India Ltd [100.0%] India

Table 6: Historical production (unit: million tonnes per annum)

ROM or Saleable 2017 2018 2019 2020 2021 2022 2023
ROM 1.5[5] 1.9[6] 1.74[7] 1.83[8] 1.73[3] 2.5[3]

Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker May 2025 release.

Background on Mine

The Durgapur Opencast mine has a designed capacity of 2.3 MTPA in an area of 1354.64 ha. The mine received environment clearance vide letter J-11015/ 66 /2006 IA.II(M)from MoEF&CC on 30 March 2007.[9] The EC for further expansion of the mine was granted on 16 March, 2012 to Durgapur Opencast expansion project from 2.30 MTPA to 3 MTPA in a reduced mine lease area of 1186.54 ha.[10]

The Durgapur Opencast Expansion Project got further clearance for deeper mining over an extended area of 1622.50 ha with no change in the capacity.[11] The mine currently operates under the name Durgapur Extension Deep OC Phase-II coal mine

Expansion Details

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 (PDF) https://web.archive.org/web/20250326010426/https://docs.prod.westerncoal.in/Durgapur_OCM_362-2024.pdf. Archived from the original (PDF) on 26 March 2025. {{cite web}}: Missing or empty |title= (help)
  2. (PDF) https://web.archive.org/web/20240122201031/http://www.westerncoal.in/images/Durgapur%20OC-2023.pdf. Archived from the original (PDF) on 22 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 (PDF) https://web.archive.org/web/20240613224926/https://coal.nic.in/sites/default/files/2024-05/srn-march-2024.pdf. Archived from the original (PDF) on 13 June 2024. {{cite web}}: Missing or empty |title= (help)
  4. (PDF) https://web.archive.org/web/20240723001427/http://www.westerncoal.in/images/grade_2021_22.pdf. Archived from the original (PDF) on 23 July 2024. {{cite web}}: Missing or empty |title= (help)
  5. (PDF) http://www.westerncoal.in/images/env_statement_2017-18.pdf. {{cite web}}: Missing or empty |title= (help)
  6. (PDF) http://www.westerncoal.in/images/env_statement_2019-20.pdf. {{cite web}}: Missing or empty |title= (help)
  7. (PDF) https://coal.nic.in/sites/default/files/2022-05/srn-march-2022.pdf. {{cite web}}: Missing or empty |title= (help)
  8. (PDF) https://coal.nic.in/sites/default/files/2023-05/srn-march-2023_0.pdf. {{cite web}}: Missing or empty |title= (help)
  9. List of environment clearance received by WCL mines
  10. Environmental Clearance for expansion in production capacity from 2.3 MTPA to 3MTPA in an area of 1186.54 ha, India MoEF&CC, 16 March 2012]
  11. Environmental Clearance for expansion in production capacity to 3MTPA in an area of 1622.50 ha, India MoEF&CC, 10 November 2017]