Easter wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Easter
Easter wind farm is an announced wind farm in Hart, Castro County, Texas, United States.
Project Details
Table 1: Phase-level project details for Easter wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner |
---|---|---|---|---|---|
1 | Announced[1] | 2025 (planned)[1] | 150 MW[1] | Onshore[1] | Tri Global Energy LLC [100%][2] |
Location
Table 2: Phase-level location details for Easter wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Hart, Castro County, Texas, United States[1] | 34.6689, -102.352 (approximate)[1] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131093704/https://www.triglobalenergy.com/news/tri-global-qualifies-1-52gw-for-ptc?archive=. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help)