Easter wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Easter

Easter wind farm is an announced wind farm in Hart, Castro County, Texas, United States.

Project Details

Table 1: Phase-level project details for Easter wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner
1 Announced[1] 2025 (planned)[1] 150 MW[1] Onshore[1] Tri Global Energy LLC [100%][2]

Location

Table 2: Phase-level location details for Easter wind farm

Phase Name Location Coordinates (WGS 84)
1 Hart, Castro County, Texas, United States[1] 34.6689, -102.352 (approximate)[1]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240131093704/https://www.triglobalenergy.com/news/tri-global-qualifies-1-52gw-for-ptc?archive=. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)