El Bayo wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
El Bayo wind farm is an operating wind farm in Ribera Alta del Ebro, Aragon, Spain.
Project Details
Table 1: Phase-level project details for El Bayo wind farm
Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|
Operating[1] | 2003[2] | 50 MW[1] | Onshore[1] | Grupo SAMCA [100%][3] | Molinos del Ebro[1] |
Location
Table 2: Phase-level location details for El Bayo wind farm
Location | Coordinates (WGS 84) |
---|---|
Ribera Alta del Ebro, Aragon, Spain[4] | 41.781, -1.2801 (exact)[4] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://web.archive.org/web/20210927191549/https://www.aeeolica.org/sobre-la-eolica/la-eolica-espana/mapa-de-parques-eolicos/aragon/el-bayo. Archived from the original on 27 September 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240126170104/http://bases.cortesaragon.es/bases/ndocumen.nsf/e86600a24e054a61c12576d2002e551c/4d28dbf939b98015c1257689004294f7/$FILE/desarrollo_eolico_aragon.pdf. Archived from the original (PDF) on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131075632/https://gruposamca.com/en/molinos-del-ebro. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20240126041921/https://idearagon.aragon.es/datosdescarga/descarga.php?file=energia/renovable.zip. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help)