El Bonillo solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
El Bonillo solar farm is an operating solar photovoltaic (PV) farm in Albacete, Castile-La Mancha, Spain.
Project Details
Table 1: Phase-level project details for El Bonillo solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2008[1] | 20 MW[1] | PV[1] | Deutsche Bank[2] | Abaste Group[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for El Bonillo solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Albacete, Castile-La Mancha, Spain[1] | 38.9167, -2.5505 (exact)[1] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://www.industryabout.com/country-territories-3/1735-spain/solar-energy/27639-el-bonillo-solar-power-plant.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://www.db.com/newsroom_news/archive/medien/deutsche-bank-achieves-financial-close-on-20mw-solar-power-plant-solaris-spain-en-11313.htm.
{{cite web}}
: Missing or empty|title=
(help)