El Castellar solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

El Castellar solar farm (Planta solar fotovoltaica El Castellar) is a solar photovoltaic (PV) farm in pre-construction in Artesa de Segre, La Noguera, Lleida, Cataluña, Spain.

Project Details

Table 1: Phase-level project details for El Castellar solar farm

Status Nameplate capacity Technology Owner
Pre-construction[1] 25 MWac[1] PV[2] Energia inagotable de Antlia SL [100%][1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for El Castellar solar farm

Location Coordinates (WGS 84)
Artesa de Segre, La Noguera, Lleida, Cataluña, Spain[1] 41.9346, 1.1260 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://mediambient.gencat.cat/web/.content/home/ambits_dactuacio/avaluacio_ambiental/energies_renovables/documents/ParcsEolics_ParcsSolars_Web.xlsx https://govclipping.com/es/catalunya/boa/2023-08-25/7584-departamento-accion-climatica-alimentacion-agenda-rural-anuncios-dogc-n-2023-8987, https://mediambient.gencat.cat/web/.content/home/ambits_dactuacio/avaluacio_ambiental/energies_renovables/documents/ParcsEolics_ParcsSolars_Web.xlsx. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. https://govclipping.com/es/catalunya/boa/2023-08-25/7584-departamento-accion-climatica-alimentacion-agenda-rural-anuncios-dogc-n-2023-8987. {{cite web}}: Missing or empty |title= (help)