El Sauz 2 power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

El Sauz 2 power station (Central CC El Sauz 2) is a power station under construction in Pedro Escobedo, Querétaro, Mexico.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
El Sauz 2 power station Pedro Escobedo, Querétaro, Mexico 20.457545, -100.120608 (approximate)[1]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit 1 construction[2] fossil gas - natural gas[3] 256[2][4] combined cycle[5][6] 2024[5][3][2]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Comisión Federal de Electricidad EPE [100%] Comisión Federal de Electricidad EPE

Articles and Resources

References

  1. https://goo.gl/maps/jBAxBy1fkuSx1ibH6. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 (PDF) https://web.archive.org/web/20240125141014/https://www.cfe.mx/finanzas/reportes-financieros/Informe%20Anual%20Documentos/Informe%20Anual%20Portal.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20240125094414/https://energiaadebate.com/ciclos-combinados-el-sauz-ii-y-salamanca-hasta-2024-confirmo-la-cfe/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. (PDF) https://web.archive.org/web/20240125102918/https://www.diputados.gob.mx/parlamentoreformaelectrica/pdf/foros/14/Iniciativa-Reforma-2021-final.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 (PDF) https://web.archive.org/web/20240125113320/https://www.cfe.mx/finanzas/Documents/Plan%20de%20Negocios%202022-2026%20V48%20PUBLICA.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20240125093925/https://www.naturalgasintel.com/column-cfes-bet-on-greater-mexico-market-share-means-more-combined-cycle-plants/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.