El Sauz 2 power station
From Global Energy Monitor
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
El Sauz 2 power station (Central CC El Sauz 2) is a power station under construction in Pedro Escobedo, Querétaro, Mexico.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
El Sauz 2 power station | Pedro Escobedo, Querétaro, Mexico | 20.457545, -100.120608 (approximate)[1] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
Unit 1 | construction[2] | fossil gas - natural gas[3] | 256[2][4] | combined cycle[5][6] | – | 2024[5][3][2] | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | Comisión Federal de Electricidad EPE [100%] | Comisión Federal de Electricidad EPE |
Articles and Resources
References
- ↑ https://goo.gl/maps/jBAxBy1fkuSx1ibH6.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 (PDF) https://web.archive.org/web/20240125141014/https://www.cfe.mx/finanzas/reportes-financieros/Informe%20Anual%20Documentos/Informe%20Anual%20Portal.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20240125094414/https://energiaadebate.com/ciclos-combinados-el-sauz-ii-y-salamanca-hasta-2024-confirmo-la-cfe/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240125102918/https://www.diputados.gob.mx/parlamentoreformaelectrica/pdf/foros/14/Iniciativa-Reforma-2021-final.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 (PDF) https://web.archive.org/web/20240125113320/https://www.cfe.mx/finanzas/Documents/Plan%20de%20Negocios%202022-2026%20V48%20PUBLICA.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125093925/https://www.naturalgasintel.com/column-cfes-bet-on-greater-mexico-market-share-means-more-combined-cycle-plants/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.