El Tablado wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
El Tablado wind farm is an operating wind farm in Soria, Castile and León, Spain.
Project Details
Table 1: Phase-level project details for El Tablado wind farm
Status | Commissioning year | Nameplate capacity | Mount type | Owner | Operator |
---|---|---|---|---|---|
Operating[1] | 2003[2] | 20[1] | Onshore | Iberdrola Renovables Energia SA[2] | Sistemas Energéticos del Moncayo SL[3] |
Location
Table 2: Phase-level location details for El Tablado wind farm
Location | Coordinates (WGS 84) |
---|---|
Soria, Castile and León, Spain[4] | 41.6930, -1.8344 (exact)[4] |
The map below shows the exact location of the wind farm:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 (PDF) https://web.archive.org/web/20211204020641/https://energia.jcyl.es/web/jcyl/binarios/56/381/Parques%20E%C3%B3licos%20CyL%2031.12.2020.pdf?blobheader=application%2Fpdf%3Bcharset%3DUTF-8&blobnocache=true. Archived from the original (PDF) on December 04, 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 "www.gcd.udc.es/subido/catedra/materiales/economia_competencia_ii/mercado_energia/CNE_Sector_energetico_Informacion_%20basica_de_los_sectores_de_la_energia_2007_anexo.pdf" (PDF). Archived from the original (PDF) on October 22, 2021. Retrieved November 29, 2021.
- ↑ "Mapa De Parques Eólicos". Asociación Empresarial Eólica. Archived from the original on October 23, 2021. Retrieved November 30, 2021.
- ↑ 4.0 4.1 "El Tablado (Spain)". The Wind Power. Archived from the original on October 30, 2021. Retrieved November 29, 2021.