Eland 1 Solar & Storage Center
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Eland 1 Solar & Storage Center is an operating solar photovoltaic (PV) farm in Mojave, Kern County, California, United States.
Project Details
Table 1: Phase-level project details for Eland 1 Solar & Storage Center
| Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
|---|---|---|---|---|---|---|
| 1 | Operating[1] | 2024[2] | 309.6 MWac[3] | PV[3] | Arevon Energy, Inc.[4] | Avantus[5] |
| 2 | Operating[6] | 2025[6] | 200 MWac[3] | PV[3] | Arevon Energy, Inc.[4] | Avantus[5] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Eland 1 Solar & Storage Center
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| 1 | Mojave, Kern County, California, United States[3] | 35.2237, -117.9770 (exact)[3] |
| 2 | Mojave, Kern County, California, United States[3] | 35.2167, -117.9770 (exact)[3] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://www.eia.gov/electricity/data/eia860m/xls/november_generator2024.xlsx https://www.eia.gov/electricity/data/eia860m/, https://www.eia.gov/electricity/data/eia860m/xls/november_generator2024.xlsx.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ https://www.eia.gov/electricity/data/eia860m/xls/november_generator2024.xlsx https://www.eia.gov/electricity/data/eia860/, https://www.eia.gov/electricity/data/eia860m/xls/november_generator2024.xlsx.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ 4.0 4.1 https://arevonenergy.com/arevon-reaches-financial-close-for-eland-1-solar-plus-storage-power-plant/.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 https://www.prnewswire.com/news-releases/capital-dynamics-and-8minute-solar-energy-partner-on-breakthrough-400mwac-eland-solar--storage-center-300990780.html https://www.pv-tech.org/us-developer-8minute-solar-energy-rebrands-as-avantus/, https://www.prnewswire.com/news-releases/capital-dynamics-and-8minute-solar-energy-partner-on-breakthrough-400mwac-eland-solar--storage-center-300990780.html.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 6.0 6.1 US Energy Information Administration (2025-12-23). "Preliminary Monthly Electric Generator Inventory". US Energy Information Administration. Archived from the original on 2025-12-23. Retrieved 2025-12-23.
