Elawan Tordesillas solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Elawan Tordesillas solar farm (Planta solar fotovoltaica Elawan Tordesillas) is a solar photovoltaic (PV) farm in pre-construction in Villalar de los Comuneros, Valladolid, Castile and León, Spain.

Project Details

Table 1: Phase-level project details for Elawan Tordesillas solar farm

Phase name Status Nameplate capacity Technology Owner Operator
1 Pre-construction[1] 50.1 MWp/dc[2] PV[3] Elawan Energy SL [100%][3] Elawan Energy Tordesillas 1[2]
2 Pre-construction[4] 50.1 MWp/dc[5] PV[3] Elawan Energy SL [100%][3] Elawan Energy Tordesillas 2[5]
3 Pre-construction[6] 50.1 MWp/dc[7] PV[3] Elawan Energy SL [100%][3] Elawan Energy Tordesillas 3[7]
4 Pre-construction[8] 50.1 MWp/dc[8] PV[9] Elawan Energy SL [100%][9] Elawan Energy Tordesillas IV[10]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Elawan Tordesillas solar farm

Phase Name Location Coordinates (WGS 84)
1 Villalar de los Comuneros, Valladolid, Castile and León, Spain[2] 41.5493, -5.1145 (approximate)[2]
2 Villalar de los Comuneros, Valladolid, Castile and León, Spain[5] 41.5291, -5.1322 (approximate)[5]
3 Villalar de los Comuneros, Valladolid, Castile and León, Spain[7] 41.5581, -5.1495 (approximate)[7]
4 Velilla, Valladolid, Castile and León, Spain[8] 41.5516, -5.0129 (approximate)[8]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-2748 https://www.pv-magazine.es/2023/01/20/mas-de-3-gws-fotovoltaicos-aprobados-en-enero-segun-el-boe/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-2748. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-2748. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 https://web.archive.org/web/20240126150225/https://www.pv-magazine.es/2023/01/20/mas-de-3-gws-fotovoltaicos-aprobados-en-enero-segun-el-boe/. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  4. https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-11307 https://www.pv-magazine.es/2023/01/20/mas-de-3-gws-fotovoltaicos-aprobados-en-enero-segun-el-boe/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-11307. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-11307. {{cite web}}: Missing or empty |title= (help)
  6. https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-2749 https://www.pv-magazine.es/2023/01/20/mas-de-3-gws-fotovoltaicos-aprobados-en-enero-segun-el-boe/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-2749. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-2749. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2420 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-10997, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2420. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  9. 9.0 9.1 "BOE-A-2023-2420 Resolución de 12 de enero de 2023, de la Dirección General de Calidad y Evaluación Ambiental, por la que se formula declaración de impacto ambiental del proyecto "Elawan Tordesillas IV" de 50,064 MWp". Boletín Oficial del Estado. 2023-01-30. Archived from the original on 2024-02-01.
  10. https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-10997. {{cite web}}: Missing or empty |title= (help)