Elk City wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Elk City wind farm is an operating wind farm in Roger Mills County, Oklahoma, United States.


Project Details

Table 1: Phase-level project details for Elk City wind farm

Phase name Status Commissioning year Nameplate capacity Mount type Owner Operator
1 Operating[1] 2009[1] 99[2] Onshore NextEra Energy INC[3] NextEra Energy INC[3]
2 Operating[1] 2010[1] 101[2] Onshore NextEra Energy INC[4] NextEra Energy INC[4]


Location

Table 2: Phase-level location details for Elk City wind farm

Phase name Location Coordinates (WGS 84)
1 Roger Mills County, Oklahoma, United States[2] 35.4755, -99.8888 (exact)[2]
2 Roger Mills County, Oklahoma, United States[2] 35.4985, -99.6587 (exact)[2]

The map below shows the exact locations of the wind farm phases:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 "Form EIA-860 detailed data (v2020 Early Release June, 2021): US Energy Information Administration". US Energy Information Administration. September 5, 2020. Archived from the original on July 13, 2021. Retrieved May 21, 2021.
  2. 2.0 2.1 2.2 2.3 2.4 2.5 Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E. (April 19, 2018). "US Wind Turbine Database (v4.0, (April 9, 2021): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data release". United States Wind Turbine Database. Archived from the original on December 3, 2021. Retrieved April 9, 2021.{{cite web}}: CS1 maint: multiple names: authors list (link)
  3. 3.0 3.1 "www.nexteraenergyresources.com/content/dam/neer/us/en/pdf/portfolio/ElkCity.pdf" (PDF). Archived from the original (PDF) on September 9, 2021. Retrieved October 20, 2021.
  4. 4.0 4.1 "www.nexteraenergyresources.com/content/dam/neer/us/en/pdf/portfolio/ElkCityII.pdf" (PDF). Archived from the original (PDF) on September 9, 2021. Retrieved October 20, 2021.