Emerald Grove solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Emerald Grove solar farm is an operating solar photovoltaic (PV) farm in Crane, Pecos County, Texas, United States.

Project Details

Table 1: Phase-level project details for Emerald Grove solar farm

Status Commissioning year Nameplate capacity Technology Owner Operator
Operating[1] 2023[1] 108 MWac[1] PV[1] Vistra Corp [100%][2] Luminant Generation Company[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Emerald Grove solar farm

Location Coordinates (WGS 84)
Crane, Pecos County, Texas, United States[1] 31.0933, -102.3596 (exact)[1]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
  2. ↑ https://web.archive.org/web/20240206194905/https://renewablesnow.com/news/vistra-breaks-ground-on-1000-mw-of-solar-storage-in-texas-715556/. Archived from the original on 2024-02-06. {{cite web}}: Missing or empty |title= (help)