30em

📝 Help us learn how people like you use GEM Wiki! Take this short survey!📝

Data will be retained following our Privacy Policy. The survey is completed in Google Forms (Privacy policy and Terms of Service)

Eouido wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Cheonsa Eoui Offshore Wind Farm, Angel, Shinan, Angel's offshore wind power plant, Yeouido, Eouiui

Eouido wind farm (천사 어의 해상풍력, 천사어의 해상풍력발전소, 어의) is a wind farm in pre-construction in Jido-eup, Sinan-gun, South Jeolla Province, South Korea.

Project Details

Table 1: Phase-level project details for Eouido wind farm

Status Commissioning year Nameplate capacity Type Owner Operator
Pre-construction[1] 2026 (planned)[2] 99 MW[1] Offshore hard mount[1] Duson Construction Co Ltd (두손건설)[1] Cheonsaeo Wind Power (천사어의 풍력발전㈜)[1]

Location

Table 2: Phase-level location details for Eouido wind farm

Location Coordinates (WGS 84)
Jido-eup, Sinan-gun, South Jeolla Province, South Korea[1] 35.1443, 126.2265 (approximate)[1]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://web.archive.org/web/20240125193118/https://www.4coffshore.com/windfarms/south-korea/eouido-south-korea-kr89.html. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240125192931/https://new.kpx.or.kr/board.es?mid=a10403040000&bid=0040&act=view&list_no=70293. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)