Eretria solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Eretria solar farm (Ερετρια 6, Ερετρια 3) is a solar photovoltaic (PV) farm in pre-construction in Larisa Regional Unit, Thessaly, Thessaly and Central Greece, Greece.
Project Details
Table 1: Phase-level project details for Eretria solar farm
Phase name | Status | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
3 | Pre-construction[1] | 42.5 MWp/dc[1] | PV[1] | Idea Phos 2 LLC (Light Idea 2 LLC) (Ιδεα Φως 2 Μονοπροσωπη Ανωνυμη Εταιρεια)[1] |
6 | Pre-construction[1] | 28.4 MWp/dc[1] | PV[1] | Idea Phos 2 LLC (Light Idea 2 LLC) (Ιδεα Φως 2 Μονοπροσωπη Ανωνυμη Εταιρεια)[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Eretria solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
3 | Larisa Regional Unit, Thessaly, Thessaly and Central Greece, Greece[1] | 39.3052, 22.6261 (exact)[1] |
6 | Larisa Regional Unit, Thessaly, Thessaly and Central Greece, Greece[1] | 39.2889, 22.6281 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References