30em

📝 Help us learn how people like you use GEM Wiki! Take this short survey!📝

Data will be retained following our Privacy Policy. The survey is completed in Google Forms (Privacy policy and Terms of Service)

España Vaciada (IGNIS) solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

España Vaciada (IGNIS) solar farm is an announced solar farm in Teruel, Aragon, Spain.

Project Details

Table 1: Phase-level project details for España Vaciada (IGNIS) solar farm

Status Nameplate capacity Technology Owner Operator
Announced[1] 37 MWac[1] Assumed PV Ignis Energía SL[1] Ignis Energía[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for España Vaciada (IGNIS) solar farm

Location Coordinates (WGS 84)
Teruel, Aragon, Spain[1] 40.3353, -1.1071 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "Cisco Makes 15-Year Solar Energy Agreement in Spain". newsroom.cisco.com. 2023-02-06. Archived from the original on 2024-05-08. Retrieved 2024-04-26.