Euchanhead wind farm
From Global Energy Monitor
| This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Euchanhead wind farm is a wind farm in pre-construction in Dumfries and Galloway, Scotland, United Kingdom.
Project Details
Table 1: Phase-level project details for Euchanhead wind farm
| Status | Nameplate capacity | Type | Owner |
|---|---|---|---|
| Pre-construction[1] | 126 MW[1] | Onshore[1] | ScottishPower Renewables [100%][2] |
Location
Table 2: Phase-level location details for Euchanhead wind farm
| Location | Coordinates (WGS 84) |
|---|---|
| Dumfries and Galloway, Scotland, Scotland, United Kingdom[1] | 55.3131, -4.1075 (exact)[1] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 "Renewable Energy Planning Database: quarterly extract". 2024-01. Archived from the original on 2024-03-27. Retrieved 2024-02-27.
{{cite web}}: Check date values in:|date=(help) - ↑ https://web.archive.org/web/20210813110129/https://www.scottishpowerrenewables.com/pages/euchanhead_renewable_energy_development.aspx. Archived from the original on 13 August 2021.
{{cite web}}: Missing or empty|title=(help)
